{"attribution":"Figures as published by the source named in each record. Compiled, cleaned, flagged and joined by Kanakku. Credit both. The licence covers Kanakku's additions only; check each source's own terms before reusing its material.","changes":[],"first_seen_on":"2026-09-30","flags":[],"license":"CC-BY-4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","missing_since":null,"project":{"code":"PWD015-19-01","constituencies":[{"mla_name":null,"mla_name_ml":null,"name":"Punalur","name_ml":"പുനലൂർ"}],"department":"Public Works Department","district":"Kollam","districts":["Kollam"],"estimate_shared_by":0,"estimated_amount":null,"executing_agency":"KRFB","expenditure":null,"group_expenditure":null,"sector":null,"sites":[],"status":null,"sub_project_code":null,"title":"182 Roads","works":[{"as_amount":350000000,"contract_amount":1073639972,"contractor":"M/s.BegorraInfrastructure&DevelopersPvt.Ltd","financial_pct":87.47650447,"fs_amount":1233661994,"lat":8.911339599704053,"lng":76.88193479966169,"loa_amount":878618842,"paid_amount":939182718,"paid_contractor":836583026,"physical_pct":100.0,"progress_note":"Culvert construction, construction of DR walls ,Gabion walls and CC walls,Drain casting and laying, and laying of GSB and WMM in Ayur Anchal road and subgrade formation with lime stabilization, GSB and WMM laying works in Anchal bypass is in progress. B","road_name":"Ayoor Anchal Punalur Road","scheduled_end":"2025-12-31","scheduled_start":"2020-10-30","spv":"KRFB","status":"Completed","tender_amount":878618842,"ts_amount":1054449258}]},"source":{"retrieved_at":"2026-09-30T11:10:07.786Z","sha256":"04a00101b9212117e081e445510a368fa8396ac84f209ff4f843707428dd17ef","snapshot":"/snapshot/1","url":"https://gis.kiifb.org/"}}