Note: these figures were last checked against the source 2 days ago. Status

Who must repair it

When PWD finishes a road or a building, the contractor stays liable for a set period to repair defects at their own cost. These are the works inside that period, as PWD lists them.

Works under liability now

161

165 works on the list in all

Liability ends within 90 days

35

After that, repairs fall to the public purse.

Contractors

64

Names as PWD publishes them.

If you see a defect: If a work on this list fails inside its period, PWD can make the contractor put it right. Report it to PWD; its own list names the office responsible for each work. PWD's list

The district is that of the PWD office handling the work; some offices also look after works in neighbouring districts.

  1. Strengthening of berm with interlocks tiles at NH 66 at PurakadNational highways · NH Sub Division AlappuzhaB K Mohammed KunhiLiable from 11-11-2021 until 11-12-2027

Contractors with the most works

Counted by works now under liability. We treat different spellings of a name as one; two people with the same name may have been counted together.

All contractors

Source

Source: the Kerala Public Works Department's DLP work list, which we read once a week. We do not keep or show the phone numbers printed on PWD's pages. The agreed amount sits in the code of PWD's page without being displayed there, and PWD has filled it in for only 1 of the 161 works now under liability.