Kanakkuമലയാളം

Note: these figures were last checked against the source 2 days ago. Status

Who must repair it

When PWD finishes a road or a building, the contractor stays liable for a set period to repair defects at their own cost. These are the works inside that period, as PWD lists them.

Works under liability now

161

165 works on the list in all

Liability ends within 90 days

35

After that, repairs fall to the public purse.

Contractors

64

Names as PWD publishes them.

If you see a defect: If a work on this list fails inside its period, PWD can make the contractor put it right. Report it to PWD; its own list names the office responsible for each work. PWD's list

The district is that of the PWD office handling the work; some offices also look after works in neighbouring districts.

  1. 2020-21 Providing BM and BC to Cherukunnam Vettiyar road 5/400 to 8/400Roads · Roads Sub Division MavelikkaraK. Sasidharan Prop Metaquard EngineersLiable from 04-10-2023 until 04-10-20262 days left
  2. 2020-21 Providing BM and BC to Cherukunnam Vettiyar road 5/400 to 8/400Roads · Roads Sub Division MavelikkaraK. Sasidharan Prop Metaquard EngineersLiable from 08-10-2023 until 08-10-20266 days left
  3. 2020-21 Providing BM and BC to Cherukunnam Vettiyar road 5/400 to 8/400Roads · Roads Sub Division MavelikkaraK. Sasidharan Prop Metaquard EngineersLiable from 09-10-2023 until 09-10-20267 days left
  4. 2020-21 Providing BM and BC to Cherukunnam Vettiyar road 5/400 to 8/400Roads · Roads Sub Division MavelikkaraK. Sasidharan Prop Metaquard EngineersLiable from 10-10-2023 until 10-10-20268 days left
  5. Budget work 2021-22-Improvements to Arattuvazhi Palli - Bypass roadRoads · Roads Sub Division AlappuzhaThaslim ALiable from 06-11-2023 until 06-11-202635 days left
  6. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 09-11-2023 until 09-11-202638 days left
  7. SLTF-SLTF 2020-21 Construction of Box culvert across Madayanthodu in SL Puram road-work-General Civil Work-1Roads · Roads Sub Division AlappuzhaJ. ManzoorLiable from 09-11-2023 until 09-11-202638 days left
  8. Budget work 2021-22-Improvements to Arattuvazhi Palli - Bypass roadRoads · Roads Sub Division AlappuzhaThaslim ALiable from 11-11-2023 until 11-11-202640 days left
  9. SLTF-SLTF 2020-21 Construction of Box culvert across Madayanthodu in SL Puram road-work-General Civil Work-1Roads · Roads Sub Division AlappuzhaJ. ManzoorLiable from 11-11-2023 until 11-11-202640 days left
  10. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 13-11-2023 until 13-11-202642 days left
  11. SLTF-SLTF 2020-21 Construction of Box culvert across Madayanthodu in SL Puram road-work-General Civil Work-1Roads · Roads Sub Division AlappuzhaJ. ManzoorLiable from 13-11-2023 until 13-11-202642 days left
  12. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 14-11-2023 until 14-11-202643 days left
  13. Budget work 2021-22-Improvements to Arattuvazhi Palli - Bypass roadRoads · Roads Sub Division AlappuzhaThaslim ALiable from 16-11-2023 until 16-11-202645 days left
  14. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 19-11-2023 until 19-11-202648 days left
  15. Budget work 2021-22 (KUTTITTU PARAMBU-KEVELI TODU)Road-Improvements to KUTTITTU PARAMBU-KEVELI TODU Road at Mannanchery PanchayathuRoads · Roads Sub Division AlappuzhaA Mohammed IsmailLiable from 20-11-2023 until 20-11-202649 days left
  16. Budget work 2019-20 Chengannur Flood Relief - Reconstruction of various roads in Chengannur LAC-In Pandanad GramapanchayathRoads · Roads Sub Division ChengannurA G Rajmohan NairLiable from 22-11-2023 until 22-11-202651 days left
  17. Budget work 2021-22 (KUTTITTU PARAMBU-KEVELI TODU)Road-Improvements to KUTTITTU PARAMBU-KEVELI TODU Road at Mannanchery PanchayathuRoads · Roads Sub Division AlappuzhaA Mohammed IsmailLiable from 23-11-2023 until 23-11-202652 days left
  18. Budget work 2021-22-Improvements to Arattuvazhi Palli - Bypass roadRoads · Roads Sub Division AlappuzhaThaslim ALiable from 23-11-2023 until 23-11-202652 days left
  19. SLTF-SLTF 2020-21 Construction of Box culvert across Madayanthodu in SL Puram road-work-General Civil Work-1Roads · Roads Sub Division AlappuzhaJ. ManzoorLiable from 23-11-2023 until 23-11-202652 days left
  20. Budget work 2021-22 (KUTTITTU PARAMBU-KEVELI TODU)Road-Improvements to KUTTITTU PARAMBU-KEVELI TODU Road at Mannanchery PanchayathuRoads · Roads Sub Division AlappuzhaA Mohammed IsmailLiable from 29-11-2023 until 29-11-202658 days left
  21. Budget work 2021-22-Improvements to Arattuvazhi Palli - Bypass roadRoads · Roads Sub Division AlappuzhaThaslim ALiable from 30-11-2023 until 30-11-202659 days left
  22. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 11-12-2023 until 11-12-202670 days left
  23. Reconstruction of damaged drain and providing interlock tiles on both sides of Alappuzha Maduraroad between ch 2/100 and 2/500Roads · Roads Sub Division AlappuzhaNizar PMLiable from 24-12-2021 until 24-12-2026Agreed amount ₹46.74 lakh · ₹46,74,02083 days left
  24. SLTF-SLTF 2020-21 Construction of Box culvert across Madayanthodu in SL Puram road-work-General Civil Work-1Roads · Roads Sub Division AlappuzhaJ. ManzoorLiable from 27-12-2023 until 27-12-202686 days left
  25. Budget work 2019-20 -Chengannur Flood Relief -Reconstruction of various roads in Chengannur LAC-In Venmony Grama panchayathRoads · Roads Sub Division ChengannurM/S Valayanattu Hiring And Construction CompanyLiable from 30-12-2023 until 30-12-202689 days left
  26. Budget work 2019-20 Chengannur Flood Relief - Reconstruction of various roads in Chengannur LAC-In Pandanad GramapanchayathRoads · Roads Sub Division ChengannurA G Rajmohan NairLiable from 30-12-2023 until 30-12-202689 days left
  27. Budget work 2019-20-Budget work 2019-20 - Chengannur Flood Relief Reconstruction of Various roads in Chengannur LAC in Chengannur Municipality.Roads · Roads Sub Division ChengannurJojy ThomasLiable from 18-01-2024 until 18-01-2027
  28. Budget work 2021-22-Improvements to Arattuvazhi Malikamukku roadRoads · Roads Sub Division AlappuzhaShan P ThomasLiable from 20-01-2024 until 20-01-2027
  29. Budget work 2021-22-Improvements to Arattuvazhi Malikamukku roadRoads · Roads Sub Division AlappuzhaShan P ThomasLiable from 24-01-2024 until 24-01-2027
  30. Budget work 2021-22-Improvements to Arattuvazhi Malikamukku roadRoads · Roads Sub Division AlappuzhaShan P ThomasLiable from 25-01-2024 until 25-01-2027
  31. Budget work 2021-22-Improvements to Arattuvazhi Malikamukku roadRoads · Roads Sub Division AlappuzhaShan P ThomasLiable from 26-01-2024 until 26-01-2027
  32. Budget work 2021-22-Improvements to Arattuvazhi Malikamukku roadRoads · Roads Sub Division AlappuzhaShan P ThomasLiable from 27-01-2024 until 27-01-2027
  33. Budget work 2021-22-Improvements to Arattuvazhi Malikamukku roadRoads · Roads Sub Division AlappuzhaShan P ThomasLiable from 29-01-2024 until 29-01-2027
  34. Budget work 2019-20-Budget work 2019-20 - Chengannur Flood Relief Reconstruction of Various roads in Chengannur LAC in Chengannur Municipality.Roads · Roads Sub Division ChengannurJojy ThomasLiable from 30-01-2024 until 30-01-2027
  35. Budget work 2019-20-Budget work 2019-20 - Chengannur Flood Relief Reconstruction of Various roads in Chengannur LAC in Chengannur Municipality.Roads · Roads Sub Division ChengannurJojy ThomasLiable from 09-02-2024 until 09-02-2027
  36. DEPOSIT-RESTORATION-Restoration work of Ravi Karunakaran Road 2nd bit due to KWA Amruth New Pipe LayingRoads · Roads Sub Division AlappuzhaNizar P MLiable from 28-03-2023 until 28-03-2028
  37. SLTF 2020-21 Providing drain, covering slab and interlock to water logged area in Perissery- Kurishummoodu- Grace theatre road at Ch 0/000 to 1/890 and Reconstruction of culvert at Ch 0/780Roads · Roads Sub Division ChengannurBabu MPLiable from 23-05-2023 until 23-05-2028
  38. SLTF 2020-21 Reconstruction of culvert in Perissery - Kurishumoode - Grace theatre road at ch 0/400.Roads · Roads Sub Division ChengannurAneesh SachariaLiable from 23-05-2023 until 23-05-2028
  39. DEPOSIT-RESTORATION WORK AMRUT-Restoration to KSRTC Chungam road due to road cut by KWA for AMRUT ProjectRoads · Roads Sub Division AlappuzhaNishad T SheriefLiable from 30-06-2023 until 30-06-2028
  40. LAC-ADS-MLA ADS 2021-22 Improvements of Haripad KSRTC depot- - construction of yard and road -DPR Preparation WorkRoads · Roads Sub Division AlappuzhaAbdul Javad.mLiable from 15-07-2023 until 15-07-2028
  41. SR Works 2022-23-Providing Drainage facilities at Pattamukku Junction in SL Puram RoadRoads · Roads Sub Division AlappuzhaShahir IbrahimLiable from 20-01-2024 until 20-01-2029
  42. DEPOSIT-RESTORATION WORK AMRUT-Restoration to KSRTC Chungam road due to road cut by KWA for AMRUT ProjectRoads · Roads Sub Division AlappuzhaNishad T SheriefLiable from 22-01-2024 until 22-01-2029
  43. DEPOSIT-RESTORATION WORK AMRUT-Restoration to KSRTC Chungam road due to road cut by KWA for AMRUT ProjectRoads · Roads Sub Division AlappuzhaNishad T SheriefLiable from 24-01-2024 until 24-01-2029
  44. SR Works 2022-23-Providing Drainage facilities at Pattamukku Junction in SL Puram RoadRoads · Roads Sub Division AlappuzhaShahir IbrahimLiable from 24-01-2024 until 24-01-2029
  45. SR Works 2022-23-Providing Drainage facilities at Pattamukku Junction in SL Puram RoadRoads · Roads Sub Division AlappuzhaShahir IbrahimLiable from 29-01-2024 until 29-01-2029
  46. DEPOSIT-RESTORATION WORK AMRUT-Restoration to KSRTC Chungam road due to road cut by KWA for AMRUT ProjectRoads · Roads Sub Division AlappuzhaNishad T SheriefLiable from 31-01-2024 until 31-01-2029
  47. SR Works 2022-23-Providing Drainage facilities at Pattamukku Junction in SL Puram RoadRoads · Roads Sub Division AlappuzhaShahir IbrahimLiable from 04-02-2024 until 04-02-2029
  48. Budget Work 2019-20 Improvements by Providing DGBM &BC to West of mavelikkara temple to South of Kandiyoor temple Road from Ch 0/000 to 1/600Roads · Roads Sub Division MavelikkaraB Sree KumarLiable from 30-09-2023 until 30-09-2026Period has ended
  49. Budget work 2019-20-Budget work 2019-20 - Chengannur Flood Relief Reconstruction of Various roads in Chengannur LAC in Chengannur Municipality.Roads · Roads Sub Division ChengannurJojy ThomasLiable from 30-09-2023 until 30-09-2026Period has ended

Contractors with the most works

Counted by works now under liability. We treat different spellings of a name as one; two people with the same name may have been counted together.

All contractors

Source

Source: the Kerala Public Works Department's DLP work list, which we read once a week. We do not keep or show the phone numbers printed on PWD's pages. The agreed amount sits in the code of PWD's page without being displayed there, and PWD has filled it in for only 1 of the 161 works now under liability.