Note: these figures were last checked against the source 2 days ago. Status

Who must repair it

When PWD finishes a road or a building, the contractor stays liable for a set period to repair defects at their own cost. These are the works inside that period, as PWD lists them.

Works under liability now

64

64 works on the list in all

Liability ends within 90 days

6

After that, repairs fall to the public purse.

Contractors

25

Names as PWD publishes them.

If you see a defect: If a work on this list fails inside its period, PWD can make the contractor put it right. Report it to PWD; its own list names the office responsible for each work. PWD's list

The district is that of the PWD office handling the work; some offices also look after works in neighbouring districts.

Soonest to end first
  1. Traffic safety work in Thodupuzha Pappootty hall Vengalloor (River view) road-Traffic safety workRoads · Roads Sub Division ThodupuzhaJ RajeshLiable from 31-10-2023 until 31-10-202629 days left
  2. Providing 20 mm bit CC to Chelachuvadu Vannappuram road km 0/000 to 14/000Roads · Roads Sub Division IdukkiJustin GeorgeLiable from 28-04-2021 until 28-04-2027Agreed amount ₹35.67 lakh · ₹35,67,158
  3. Urgent construction of retaining wall at ch:1/720 LHS-Anavilasam -Kallumedu-Chenkara Road.-C-Urgent construction of retaining wall at ch:1/720 LHS-Anavilasam -Kallumedu-Chenkara Road.Roads · Roads Sub Division PeerumadeAnish ZachariahLiable from 21-06-2022 until 21-07-2028
  4. Urgent Repairs to Thallakkanam Manguva Chinnar road from KM 10/600 to 10/870- Urgent RepairsRoads · Roads Sub Division IdukkiAshik P MuhammedLiable from 23-11-2022 until 23-12-2028

Contractors with the most works

Counted by works now under liability. We treat different spellings of a name as one; two people with the same name may have been counted together.

All contractors

Source

Source: the Kerala Public Works Department's DLP work list, which we read once a week. We do not keep or show the phone numbers printed on PWD's pages. The agreed amount sits in the code of PWD's page without being displayed there, and PWD has filled it in for only 1 of the 64 works now under liability.