Kanakkuമലയാളം

Note: these figures were last checked against the source 2 days ago. Status

Who must repair it

When PWD finishes a road or a building, the contractor stays liable for a set period to repair defects at their own cost. These are the works inside that period, as PWD lists them.

Works under liability now

2462

2475 works on the list in all

Liability ends within 90 days

409

After that, repairs fall to the public purse.

Contractors

762

Names as PWD publishes them.

If you see a defect: If a work on this list fails inside its period, PWD can make the contractor put it right. Report it to PWD; its own list names the office responsible for each work. PWD's list

The district is that of the PWD office handling the work; some offices also look after works in neighbouring districts.

  1. DEPOSIT-Deposit work-Construction of Smart village office building for Malappuram village-Work-General Civil Work-1Buildings · Buildings Sub Division ManjeriAli M PLiable from 12-11-2021 until 12-11-202641 days left
  2. Budget 2022-23. Construction of drain culverts and retaining walls in Kollamkonam Kuruthamkodu road km 0/222 to 2/600.-Budget 2022-23. Construction of drain, culverts and retaining walls in Kollamkonam Kuruthamkodu road km 0/222 to 2/600 in Kattakada LAC.Roads · Roads Sub Division NedumangadArun V GLiable from 12-11-2023 until 12-11-202641 days left
  3. Construction of Academic block 2nd floor ( second stage) at NMSM college Govt college , Kalpetta, Wayanad DistrictBuildings · Buildings Sub Division ManjeriAli M PLiable from 12-11-2021 until 12-11-202641 days left
  4. Deposit work-Construction of Smart village office building for Malappuram villageBuildings · Buildings Sub Division ManjeriAli M PLiable from 12-11-2021 until 12-11-202641 days left
  5. Improvements to Kallachi Mini Bypass Road km. 0/000 to 0/435-Road workRoads · Roads Sub Division VadakaraAjeendran AlakkandyLiable from 12-11-2023 until 12-11-202641 days left
  6. Interior Works to the Conference Hall at Mini Civil Station Kottarakkara-Interior Works to Conference Hall-Composite WorkBuildings · Buildings Sub Division KottarakkaraSivaprasad .NLiable from 12-11-2023 until 12-11-202641 days left
  7. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 13-11-2023 until 13-11-202642 days left
  8. Improvements to Kallachi Mini Bypass Road km. 0/000 to 0/435-Road workRoads · Roads Sub Division VadakaraAjeendran AlakkandyLiable from 13-11-2023 until 13-11-202642 days left
  9. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 13-11-2023 until 13-11-202642 days left
  10. SLTF-SLTF 2020-21 Construction of Box culvert across Madayanthodu in SL Puram road-work-General Civil Work-1Roads · Roads Sub Division AlappuzhaJ. ManzoorLiable from 13-11-2023 until 13-11-202642 days left
  11. DEPOSIT-Providing street light at medical college residential area -Providing Street lights to residential area at medical college campus Thrissur -General Electrical WorkBuildings · Electrical Sub Division ThrissurM/S V-tech Electric (P) LtdLiable from 14-11-2023 until 14-11-202643 days left
  12. CONSTRUCTION OF NEW BUILDING FOR GOVT.H.S.S.KUNNAMBuildings · Buildings Sub Division HarippadM.ismail KuttyLiable from 14-11-2021 until 14-11-202643 days left
  13. General Education Department-Higher Secondary education-Construction of Laboratory Cum library Building for G.H.S.S. Palapetty in Malappuram District (Ponnani L.A.C.)Buildings · Buildings Sub Division HarippadM.ismail KuttyLiable from 14-11-2021 until 14-11-202643 days left
  14. Sabarimala Festival works 2020-21. Improvements to kulamada pallikkal road by providing DBM and BCRoads · Roads Sub Division KollamA ManafLiable from 14-11-2023 until 14-11-202643 days left
  15. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 14-11-2023 until 14-11-202643 days left
  16. Budget Work 2019-20 .Improvements by providing BM and BC to Pazhayattinkuzhi -Sangha mukku-Kaithari mukku -Palathara Varazhikam road in Kollam corparationRoads · Roads Sub Division KollamPradeeep PLiable from 15-11-2023 until 15-11-202644 days left
  17. Election - Construction of Ware house at District for storage of EVM & VVPAT machine Thrissur (District).Buildings · Buildings Sub Division ThrissurS KrishnakumarLiable from 15-11-2021 until 15-11-202644 days left
  18. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 15-11-2023 until 15-11-202644 days left
  19. Health and family welfare Department- Medical Education Service - Implementation of Plan Schemes during 2017-18- Government Medical College, Kozhikode - Construction of New Examination Hall -Providing Lift-Electrical Lift WorkBuildings · Electrical Sub Division KozhikkodeM/s Escon Elevators Private LimitedLiable from 15-11-2023 until 15-11-202644 days left
  20. Improvements and BM and BC works in between km 0/000 to 2/000 Anamangad - Manalaya- Muthukkurussi road in Perinthalmanna LAC.Roads · Roads Sub Division PerinthalmannaP Abdul NasarLiable from 15-11-2023 until 15-11-202644 days left
  21. Improvements to Kallachi Mini Bypass Road km. 0/000 to 0/435-Road workRoads · Roads Sub Division VadakaraAjeendran AlakkandyLiable from 15-11-2023 until 15-11-202644 days left
  22. MLA-ADS Honorable Minister G.Sudhakaran- Construction of New Building for Govt.J.B. School Punnapra in Ambalappuzha LA Constituency ,Alappuzha.Buildings · Buildings Sub Division AlappuzhaSunil MLiable from 15-11-2021 until 15-11-202644 days left
  23. NH SRV Road -NH SRV Road Construction of CC Drain at Karunagappally Bus stand PortionRoads · Roads Sub Division KarunagappallyMuhammed AfsalLiable from 15-11-2023 until 15-11-202644 days left
  24. Plan Scheme 2018 - 19 - Revenue Dept - Construction of New Building For Staff Quarters at Karivellur Village Office in Payyanur Taluk, Kannur Dist.Buildings · Buildings Sub Division ThalipparambaP V KrishnanLiable from 15-11-2021 until 15-11-202644 days left
  25. Providing drain at Kunjanadikkulam Madathilkarazhma road at Ch 0/200,Ch 0/300,Ch 2/000 & Ch 4/000 -Providing drain to Kunjanadikkulam Madathilkarazhma road Ch 0/000 to 4/360 roadRoads · Roads Sub Division KarunagappallyImamudeen .SLiable from 15-11-2023 until 15-11-202644 days left
  26. Urgent maintenance and repairing works to the main building roof at Govt.Women's Polytechnic college Nedupuzha, Thrissur.Buildings · Buildings Sub Division ThrissurS KrishnakumarLiable from 15-11-2021 until 15-11-202644 days left
  27. Urgent maintenance works in NGO Quarters - Type - II (Quarters nos. 9 to 18), MuvattupuzhaBuildings · Buildings Sub Division ThalipparambaP V KrishnanLiable from 15-11-2021 until 15-11-202644 days left
  28. BUDGET WORKS 2019-20 IMPROVEMENTS TO OYOOR AMPALAKUNNU KAITHAYIL VAPPALA ROADRoads · Roads Sub Division KottarakkaraM Abdul KhalamLiable from 16-11-2023 until 16-11-202645 days left
  29. Budget Work 2019-20 .Improvements by providing BM and BC to Pazhayattinkuzhi -Sangha mukku-Kaithari mukku -Palathara Varazhikam road in Kollam corparationRoads · Roads Sub Division KollamPradeeep PLiable from 16-11-2023 until 16-11-202645 days left
  30. Budget work 2021-22-Improvements to Arattuvazhi Palli - Bypass roadRoads · Roads Sub Division AlappuzhaThaslim ALiable from 16-11-2023 until 16-11-202645 days left
  31. CONSTRUCTION OF PRE- METRIC HOSTEL FOR BOYS, NENMINI IN PERINTHALMANNA, MALAPPURAM DIST.Buildings · Buildings Sub Division PerinthalmannaMohammedLiable from 16-11-2023 until 16-11-202645 days left
  32. Construction of Govt. UP School, Kumarapuram - Thiruvananthapuram (Phase 1)Buildings · Buildings Sub Division ThiruvananthapuramG Gopalakrishnan NairLiable from 16-11-2021 until 16-11-202645 days left
  33. General Education Department-Higher Secondary education-Construction of Laboratory Cum library Building for G.H.S.S. Thrikkavu in Malappuram District (Ponnani L.A.C.)Buildings · Buildings Sub Division ParappanangadiVelayudhan MLiable from 16-11-2021 until 16-11-202645 days left
  34. PLAN SCHEME 2020-2021- CONSTRUCTION OF BUILDING FOR SMART VILLAGE OFFICE PULLUT, THRISSUR DISTRICT.Buildings · Buildings Sub Division ThiruvananthapuramG Gopalakrishnan NairLiable from 16-11-2021 until 16-11-202645 days left
  35. NABARD RIDF XX111 Construction of New Building in Govt: HSS, Cherunniyoor.Buildings · Buildings Sub Division AttingalP Ramachandran ThampiLiable from 17-11-2021 until 17-11-202646 days left
  36. Public Works Department-Construction of New Building for Govt. L P School Meladoor-General Civil Work-1Buildings · Buildings Sub Division AttingalP Ramachandran ThampiLiable from 17-11-2021 until 17-11-202646 days left
  37. Urgent Special Repairs at Ladies Hostel A Block of Government College of Engineering, Kannur - Providing sheet roofing and Floor tiling works.Buildings · Buildings Sub Division KannurAnish MathewLiable from 17-11-2021 until 17-11-202646 days left
  38. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 18-11-2023 until 18-11-202647 days left
  39. Providing drain at Kunjanadikkulam Madathilkarazhma road at Ch 0/200,Ch 0/300,Ch 2/000 & Ch 4/000 -Providing drain to Kunjanadikkulam Madathilkarazhma road Ch 0/000 to 4/360 roadRoads · Roads Sub Division KarunagappallyImamudeen .SLiable from 18-11-2023 until 18-11-202647 days left
  40. ROAD SAFETY WORK INCLUDING INSTALLATION OF CRASH BARRIERS , PEDASTRIAN CROSSING, RUMBLE STRIP, SIGN BOARDS & ROAD STUDS IN MANARCADU THENGANA ROAD AND INSTALLATION OF CRASH BARRIERS IN THALAKKULAM - VENKOTTA ROAD&PAIPPAD - MAMMOOD ROAD -Work-General Civil work-Crash barrierRoads · Roads Sub Division ChanganacherryJoseLiable from 18-11-2023 until 18-11-202647 days left
  41. Sabarimala Festival works 2020-21. Improvements to kulamada pallikkal road by providing DBM and BCRoads · Roads Sub Division KollamA ManafLiable from 18-11-2023 until 18-11-202647 days left
  42. Sheet Roofing work for main building at THS, CheruvathurBuildings · Buildings Sub Division KanjangadSanish Kumar KLiable from 18-11-2021 until 18-11-202647 days left
  43. Budget 2022-23. Construction of drain culverts and retaining walls in Kollamkonam Kuruthamkodu road km 0/222 to 2/600.-Budget 2022-23. Construction of drain, culverts and retaining walls in Kollamkonam Kuruthamkodu road km 0/222 to 2/600 in Kattakada LAC.Roads · Roads Sub Division NedumangadArun V GLiable from 19-11-2023 until 19-11-202648 days left
  44. Construction of Computer Lab and Office room for Perumala ITIBuildings · Buildings Sub Division NedumangadVipinraj NILiable from 19-11-2021 until 19-11-202648 days left
  45. Construction of a building for Panniannur Veterinary DispensaryBuildings · Buildings Sub Division ThalasherySatheesh Das K.Liable from 19-11-2021 until 19-11-202648 days left
  46. LAC ADS 2019-20:Smt. AYISHAPOTTI MLA , KOTTARAKKARA LAC- CONSRUCTION OF NEW BUILDING FOR GWUPS VELIYAM IN VELIYAM GPBuildings · Buildings Sub Division NedumangadVipinraj NILiable from 19-11-2021 until 19-11-202648 days left
  47. SLTF-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000-FDR 2022-23 Providing drainage facilities to Block Headquarters - Cheruthanakadavu road near Ch. 0/000Roads · Roads Sub Division AlappuzhaMuhammed AfsalLiable from 19-11-2023 until 19-11-202648 days left
  48. Budget Work 2020-2021 : Providing BM & BC to Yeroor - Edamon PWD road ( Aylara Jn to Aayiranellore ) .Roads · Roads Sub Division PunalurP P Ajithkumar M D Akshaya BuildersLiable from 20-11-2023 until 20-11-202649 days left
  49. Budget work 2021-22 (KUTTITTU PARAMBU-KEVELI TODU)Road-Improvements to KUTTITTU PARAMBU-KEVELI TODU Road at Mannanchery PanchayathuRoads · Roads Sub Division AlappuzhaA Mohammed IsmailLiable from 20-11-2023 until 20-11-202649 days left
  50. Construction of New Building for Borstal school Kakkanad, ErnakulamBuildings · Buildings Sub Division ErnakulamP .M KunjumakkarLiable from 20-11-2021 until 20-11-202649 days left
  51. LAC-ADS 2019-20 CONSTRUCTION OF PROPOSED CLASS ROOM BUILDING & AUDITORIUM AT GOVT.LPS VALLOORBuildings · Buildings Sub Division ErnakulamP .M KunjumakkarLiable from 20-11-2021 until 20-11-202649 days left
  52. DEPOSIT-Providing New gate ,retaining wall ,Ramp and other connected work in Govt. Womens ITI Kalamassery , Ernakulam -estimateBuildings · Buildings Sub Division ErnakulamNazar T KLiable from 21-11-2023 until 21-11-202650 days left
  53. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 21-11-2023 until 21-11-202650 days left
  54. ROAD SAFETY WORK INCLUDING INSTALLATION OF CRASH BARRIERS , PEDASTRIAN CROSSING, RUMBLE STRIP, SIGN BOARDS & ROAD STUDS IN MANARCADU THENGANA ROAD AND INSTALLATION OF CRASH BARRIERS IN THALAKKULAM - VENKOTTA ROAD&PAIPPAD - MAMMOOD ROAD -Work-General Civil work-Crash barrierRoads · Roads Sub Division ChanganacherryJoseLiable from 21-11-2023 until 21-11-202650 days left
  55. BUDGETWORK-2020-21 IMPROVEMENTS TO GANAPATHYNADA ARKANNOOR MANIYANMUKKU ROAD CH. 0/000 TO 4/000 KM BY PROVIDING BM&BC AND ALLIED WORKS IN CHADAYAMANGALAM LACRoads · Roads Sub Division KottarakkaraKishor. ALiable from 22-11-2023 until 22-11-202651 days left
  56. Budget 2022-23. Construction of drain culverts and retaining walls in Kollamkonam Kuruthamkodu road km 0/222 to 2/600.-Budget 2022-23. Construction of drain, culverts and retaining walls in Kollamkonam Kuruthamkodu road km 0/222 to 2/600 in Kattakada LAC.Roads · Roads Sub Division NedumangadArun V GLiable from 22-11-2023 until 22-11-202651 days left
  57. Budget work 2019-20 Chengannur Flood Relief - Reconstruction of various roads in Chengannur LAC-In Pandanad GramapanchayathRoads · Roads Sub Division ChengannurA G Rajmohan NairLiable from 22-11-2023 until 22-11-202651 days left
  58. Construction of Compound Wall and Special Repairs to old Building of Women's Polytechnic ,Kayamkulam .Buildings · Buildings Sub Division KottarakkaraManilal TLiable from 22-11-2021 until 22-11-202651 days left
  59. Construction of Temporary class rooms for Govt Arts & Science College ,PeringomeBuildings · Buildings Sub Division WadakkancherryM M SubairLiable from 22-11-2021 until 22-11-202651 days left
  60. Improvements and BM and BC works in between km 0/000 to 2/000 Anamangad - Manalaya- Muthukkurussi road in Perinthalmanna LAC.Roads · Roads Sub Division PerinthalmannaP Abdul NasarLiable from 22-11-2023 until 22-11-202651 days left

Contractors with the most works

Counted by works now under liability. We treat different spellings of a name as one; two people with the same name may have been counted together.

All contractors

Source

Source: the Kerala Public Works Department's DLP work list, which we read once a week. We do not keep or show the phone numbers printed on PWD's pages. The agreed amount sits in the code of PWD's page without being displayed there, and PWD has filled it in for only 7 of the 2462 works now under liability.