Fencing - man-animal conflict in the forest boundary - Hanging Solar Power Fence
Approved by KIIFB
₹110.01 crore
₹1,10,01,16,000
Paid so far
₹59.24 crore
₹59,23,59,311 · 53.8% of the amount approved
Works
55
₹59.24 crore paid across the works
Works (55)
₹0paid
Not publishedapproved
Supply of Materials for Solar Fence Cheekuzhy to Elichira - Nature Fence
Work awarded₹2.15 lakhpaid
₹2.26 lakhapproved
Supply of Materials for Solar Fence -Chavady-Para Tribal Colony - Nature Fence
Work awarded₹2.15 lakhpaid
₹2.26 lakhapproved
Agali to Moochikadavu Under Ommala Forest Station in Agali Range - Ms Solaris Energy System
Work awarded₹8.83 lakhpaid
₹10.65 lakhapproved
Solar Power Fence 4.00 Km from Chundakulam -Moochikadavu Under Sholayur Forest Station in Agali Range - Ms Solaris Energy System
Work awarded₹5.57 lakhpaid
₹7.09 lakhapproved
Solar Power Fence 3.00 Km from Vechapathy -Gonjiyoor Under Sholayur Forest Station in Agali - Ms Solaris Energy System
Work awarded₹5.16 lakhpaid
₹5.32 lakhapproved
Solar Power Fence 3.00 Km from Chinnaparambu to Onthumala Under Ommala Forest Station in Agali Range - Ms Solaris Energy System
Work awarded₹4.52 lakhpaid
₹5.31 lakhapproved
Supply of Material for Solar Fencing- Anakkalto Kalliyara - M/s Nature Fencing
Work awarded₹10.3 lakhpaid
₹10.84 lakhapproved
Construction of rail fence from Sathramkunnu to Moodakolli(10 kms)
Work awarded₹12.97 crorepaid
₹13.98 croreapproved
Construction of Elephant proof wall at Wayanad in Sulthan Batheri, Tholpetty, Kurichiat Division
Work awarded₹0paid
₹1approved
Construction of Elephant Proof Wall at Tholpetty Area in Tholpetty Range 0.046Kms, Wayanad Wildlife Division M/s. Saheer T P
Work started₹7.42 lakhpaid
₹8.3 lakhapproved
Construction of Elephant Proof Wall at Vakeri area in Tholpetty Range, Wayanad Wildlife Division 34 Metres M/s. Saheer T P
Work started₹5.4 lakhpaid
₹6.26 lakhapproved
Construction of Elephant proof wall at Chundappady area in Wayanad/Sulthan Bathery Wildlife division - 0.110 Kms M/s. Saheer T P
Work awarded₹17.37 lakhpaid
₹19.2 lakhapproved
Supply, Installation & commissioning of Solar fence from Technical High School Junction to Ambalakkadavu in Kulathuppuzha sectionof Anchal Range, Punalur divison
Work started₹2.72 lakhpaid
₹4.12 lakhapproved
Supply and installation of Solar Power Fencing in Thannimoodu Settlement area in Chittar North Section of Kulathuppuzha Range
Work awarded₹6.63 lakhpaid
₹9.26 lakhapproved
Construction of Solar Power Fencing in Governor Seat to Churappara in Kottekkad section under Walayar Range, Palakkad Division
Work awarded₹3.03 lakhpaid
₹7.55 lakhapproved
Relocation of non-tribal private settlements from Channamala settlement of Thiruvananthapuram Forest Division under Southern Circle, Kollam
Work awarded₹1.5 crorepaid
₹1.5 croreapproved
Construction of Solar Power Fencing from Pannimada to IIT wall in Pudussery South Section under Walayar Range, Palakkad Division
Work awarded₹2.86 lakhpaid
₹3.23 lakhapproved
Construction of Solar Power Fencing from Vattappara to Attuppathy in Pudussery North Section under Walayar Range, Palakkad Division
Work awarded₹3.89 lakhpaid
₹3.89 lakhapproved
Construction of Solar Power Fencing in Uroli Bit I in Pudussery South Section under Walayar Range, Palakkad Division
Work awarded₹4.33 lakhpaid
₹4.75 lakhapproved
Construction of Solar Power Fencing from Iruthodu to Pambuchathamannu in Chittar North Section of Kulathuppuzha Range, Thiruvananthapuram Division
Work awarded₹9.17 lakhpaid
₹12.31 lakhapproved
Construction of Solar Power Fencing from Micamon to Kakkapponnu area in Ambanar Forest Station of Pathanapuram Range, Punalur Division
Work awarded₹5.07 lakhpaid
₹5.08 lakhapproved
Construction of Solar Power Fencing from Perumthoil to Chengapara area in Ambanar Forest Station of Pathanapuram Range, Punalur Division
Work awarded₹4.96 lakhpaid
₹4.97 lakhapproved
Construction of Elephant Proof Wall from Dhoni to Meenvallam (0.30 kms) area under Olavakkode Range in Palakkad Forest Division
Work started₹36.7 lakhpaid
₹37.69 lakhapproved
Relocation of non-tribal private settlements from Vattakkarikkom settlement of Thiruvananthapuram Forest Division under Southern Circle, Kollam
Work awarded₹2.85 crorepaid
₹4.5 croreapproved
Construction of Solar Power Fencing from Kandachira to Technical High School Junction in Kalamkunnu Section of Anchal Range, Punalur Division
Work awarded₹5.19 lakhpaid
₹7.69 lakhapproved
Construction of Crash Guard Steel Rope Fencing from Koodalkkadavu to Palvelicham in Thrissillery Section of Begur range under North Wayanad Forest Division. Length - 6 km
Work started₹3.62 crorepaid
₹4.07 croreapproved
Construction of Crash Guard Steel Rope Fencing at Dasanakkara - Pathiriyambam, Pathramoola and Kakkodan Block of Pulppalli Forest Station, South Wayanad Forest Division, Length - 14.5 kms
Work awarded₹5.42 crorepaid
₹8.13 croreapproved
Construction of Crash Guard Steel Rope Fencing from Kunnumpuram to 10th Mile of Sugandhagiri Section in Kalpetta Range, South Wayanad Forest Division, Length - 3 kms
Work started₹0paid
₹1approved
Construction of Solar Power Fencing around Randam mile settlement in Kalluvarambu Section of Thenmala Range during 2017-18 under Thenmala Forest Division (3 kms)
Work awarded₹0paid
₹5.23 lakhapproved
Construction of Solar Power Fencing around Peruvazhikala settlement in Kalluvarambu section of Thenmala Range during 2017-18 under Thenmala Forest Division (3.5 kms)
Work awarded₹0paid
₹5.92 lakhapproved
Construction of Solar Power fencing around Vattakkarikkom settlement in Kalluvarambu Section of Thenmala Range during 2017-18 under Thenmala Forest Division (2 kms)
Work started₹0paid
₹3.85 lakhapproved
Construction of Solar Power Fencing around Kulampi settlement in Kalluvarambu Section of Thenmala Range during 2017-18 under Thenmala Forest Division (3 kms)
Work awarded₹0paid
₹5.25 lakhapproved
Construction of Solar Power Fencing from Thonical to Pathipalam in Edamon Section of Thenmala Range during 2017-18 under Thenmala Forest Division (5 kms)
Work started₹0paid
₹8.62 lakhapproved
Relocation of non-tribal private settlements from Mathrakkarikkom settlement of Thiruvananthapuram Forest Division under Southern Circle, Kollam (68 Eligible families)
Work awarded₹6.9 crorepaid
₹10.2 croreapproved
Construction of Elephant Proof Stone wall from Puthuveedu to Kannamoola in Kurichiat Range under Wildlife Forest Division, Wayanad
Work awarded₹16.15 lakhpaid
₹16.26 lakhapproved
Construction of Elephant Proof Stone wall from Puthuveedu to Pannikkuzhimoola in Kurichiat Range under Wildlife Forest Division, Wayanad (0.130 kms)
Work awarded₹22.09 lakhpaid
₹24.19 lakhapproved
Relocation of non-tribal private settlements from Kottiyoor settlement of Kannur Forest Division under Northern Circle, Kannur
Work awarded₹6.45 crorepaid
₹6.45 croreapproved
Relocation of non-tribal private settlements from Kollivayal settlement of South Wayanad Forest Division under Northern Circle, Kannur
Work awarded₹90 lakhpaid
₹1.8 croreapproved
Relocation of non-tribal private settlements from Chullikkad settlement of South Wayanad Forest Division under Northern Circle, Kannur
Work awarded₹45 lakhpaid
₹60 lakhapproved
Relocation of non-tribal private settlements from Madaparambu settlement of South Wayanad Forest Division under Northern Circle, Kannur
Work awarded₹5.4 crorepaid
₹9.15 croreapproved
Relocation of non-tribal private settlements from Manalvayal settlement of South Wayanad Forest Division under Northern Circle, Kannur
Work awarded₹1.8 crorepaid
₹2.4 croreapproved
Construction of Solar Power Fencing around Thiruvizhamkunnu Forest Station under Mannarkkad Forest Division
Work awarded₹1.31 lakhpaid
₹1.91 lakhapproved
Construction of Solar Power Fencing from Puttanikkad to Kunthipalam under Mannarkkad Forest Division
Work awarded₹4.08 lakhpaid
₹5.88 lakhapproved
Construction of Solar Power Fencing Kacheriparambu to Kottani under Mannarkkad Forest Division
Work awarded₹4.08 lakhpaid
₹5.88 lakhapproved
Construction of Solar Power Fencing from Parakalladi to Vakkode (3 km) under Mannarkkad Range, Mannarkkad Forest Division
Work started₹4.82 lakhpaid
₹9.12 lakhapproved
Construction of Solar Power Fencing from Karipponni to Parakalladi to Vakkode (2.5 km) under Mannarkkad Range, Mannarkkad Forest Division
Work awarded₹4.06 lakhpaid
₹4.88 lakhapproved
Construction of Solar Power Fencing from Meenvallam to Kurumugham (5 km) in Mannarkkad Range, Mannarkkad Forest Division
Work awarded₹0paid
₹9.52 lakhapproved
Construction of Solar Power Fencing from Pambanthodu - Cherumala to Oodakunnu (4 km) under Mannarkkad Range, Mannarkkad Forest Division
Work awarded₹0paid
₹7.37 lakhapproved
Construction of Solar Power Fencing from Kurumugham to Atla under Mannarkkad Forest Range, Mannarkkad Forest Division (4 km)
Work awarded₹0paid
₹7.37 lakhapproved
Voluntary Relocation of eligible families from Non-Tribal Private Settlements in North Wayanad Forest Division (Phase I)
Work awarded₹90 lakhpaid
₹17.85 croreapproved
Voluntary Relocation of eligible families from Non-Tribal Private Settlements in Wayanad Wildlife Division (Phase I)
Work awarded₹1.2 crorepaid
₹13.5 croreapproved
Supply, Installation, Testing & Commissioning of Hanging Solar Power Fencing Along the Forest Boundaries of Wayanad Wildlife Forest Division
Work awarded₹3.5 crorepaid
₹6 croreapproved
Supply, Installation, Testing & Commissioning of Hanging Solar Power Fencing Along the Forest Boundaries of Nilambur South Forest Division
Work awarded₹1.32 crorepaid
₹2.1 croreapproved
Supply, Installation, Testing & Commissioning of Hanging Solar Power Fencing Along the Forest Boundaries of South Wayanad and North Wayanad Forest Divisions
Work awarded₹1.95 crorepaid
₹4.9 croreapproved
Total of the works: ₹1,10,12,65,945 approved, ₹59,23,59,311 paid.
Details
- Department
- Forest & Wild Life
- Implementing agency (SPV)
- State Forest Development Agency Kerala
- Announced under
- Fencing - man-animal conflict in forest
- KIIFB status
- Approved
Source
- Source
- KIIFB project statuskiifb.org/prjStatus.jsp
- Amounts retrieved
- 30-09-2026
- Works last checked
- 02-10-2026
- First recorded
- 30-09-2026
The same project on the map dashboard
KIIFB's two pages share no identifier. We joined these because the approved amount, department and implementing agency are the same.
- Construction of rail fence from Sathramkunnu to Moodakolli(10 kms) FOR001-01-09 · ₹12.39 crore spent
- Construction of Crash Guard Steel Rope Fencing from Koodalkkadavu to Palvelicham in Thrissillery Section of Begur range under North Wayanad Forest Division. Length - 6 km FOR001-01-27 · ₹3.49 crore spent
- Supply, Installation, Testing & Commissioning of Hanging Solar Power Fencing Along the Forest Boundaries of South Wayanad and North Wayanad Forest Divisions FOR001-01-55 · ₹1.87 crore spent
- Construction of Crash Guard Steel Rope Fencing at Dasanakkara - Pathiriyambam, Pathramoola and Kakkodan Block of Pulppalli Forest Station, South Wayanad Forest Division, Length - 14.5 kms FOR001-01-28 · ₹1.84 crore spent
- Construction of Elephant Proof Wall from Dhoni to Meenvallam (0.30 kms) area under Olavakkode Range in Palakkad Forest Division FOR001-01-24 · ₹35.39 lakh spent
- Construction of Elephant Proof Stone wall from Puthuveedu to Pannikkuzhimoola in Kurichiat Range under Wildlife Forest Division, Wayanad (0.130 kms) FOR001-01-37 · ₹21.06 lakh spent
- Construction of Elephant proof wall at Chundappady area in Wayanad/Sulthan Bathery Wildlife division - 0.110 Kms M/s. Saheer T P FOR001-01-13 · ₹16.71 lakh spent
- Construction of Elephant Proof Stone wall from Puthuveedu to Kannamoola in Kurichiat Range under Wildlife Forest Division, Wayanad FOR001-01-36 · ₹15.39 lakh spent
- Supply of Material for Solar Fencing- Anakkalto Kalliyara - M/s Nature Fencing FOR001-01-08 · ₹10.3 lakh spent
- Construction of Solar Power Fencing from Iruthodu to Pambuchathamannu in Chittar North Section of Kulathuppuzha Range, Thiruvananthapuram Division FOR001-01-21 · ₹8.77 lakh spent
- Agali to Moochikadavu Under Ommala Forest Station in Agali Range - Ms Solaris Energy System FOR001-01-04 · ₹8.47 lakh spent
- Construction of Elephant Proof Wall at Tholpetty Area in Tholpetty Range 0.046Kms, Wayanad Wildlife Division M/s. Saheer T P FOR001-01-11 · ₹7.14 lakh spent
- Supply and installation of Solar Power Fencing in Thannimoodu Settlement area in Chittar North Section of Kulathuppuzha Range FOR001-01-15 · ₹6.34 lakh spent
- Solar Power Fence 4.00 Km from Chundakulam -Moochikadavu Under Sholayur Forest Station in Agali Range - Ms Solaris Energy System FOR001-01-05 · ₹5.35 lakh spent
- Construction of Elephant Proof Wall at Vakeri area in Tholpetty Range, Wayanad Wildlife Division 34 Metres M/s. Saheer T P FOR001-01-12 · ₹5.19 lakh spent
- Solar Power Fence 3.00 Km from Vechapathy -Gonjiyoor Under Sholayur Forest Station in Agali - Ms Solaris Energy System FOR001-01-06 · ₹4.95 lakh spent
- Construction of Solar Power Fencing from Kandachira to Technical High School Junction in Kalamkunnu Section of Anchal Range, Punalur Division FOR001-01-26 · ₹4.94 lakh spent
- Construction of Solar Power Fencing from Micamon to Kakkapponnu area in Ambanar Forest Station of Pathanapuram Range, Punalur Division FOR001-01-22 · ₹4.86 lakh spent
- Construction of Solar Power Fencing from Perumthoil to Chengapara area in Ambanar Forest Station of Pathanapuram Range, Punalur Division FOR001-01-23 · ₹4.76 lakh spent
- Solar Power Fence 3.00 Km from Chinnaparambu to Onthumala Under Ommala Forest Station in Agali Range - Ms Solaris Energy System FOR001-01-07 · ₹4.52 lakh spent
- Construction of Solar Power Fencing from Parakalladi to Vakkode (3 km) under Mannarkkad Range, Mannarkkad Forest Division FOR001-01-46 · ₹4.49 lakh spent
- Construction of Solar Power Fencing in Uroli Bit I in Pudussery South Section under Walayar Range, Palakkad Division FOR001-01-20 · ₹4.11 lakh spent
- Construction of Solar Power Fencing from Puttanikkad to Kunthipalam under Mannarkkad Forest Division FOR001-01-44 · ₹3.88 lakh spent
- Construction of Solar Power Fencing Kacheriparambu to Kottani under Mannarkkad Forest Division FOR001-01-45 · ₹3.88 lakh spent
- Construction of Solar Power Fencing from Karipponni to Parakalladi to Vakkode (2.5 km) under Mannarkkad Range, Mannarkkad Forest Division FOR001-01-47 · ₹3.79 lakh spent
- Construction of Solar Power Fencing from Vattappara to Attuppathy in Pudussery North Section under Walayar Range, Palakkad Division FOR001-01-19 · ₹3.7 lakh spent
- Construction of Solar Power Fencing around Peruvazhikala settlement in Kalluvarambu section of Thenmala Range during 2017-18 under Thenmala Forest Division (3.5 kms) FOR001-01-31 · ₹3.28 lakh spent
- Construction of Solar Power Fencing in Governor Seat to Churappara in Kottekkad section under Walayar Range, Palakkad Division FOR001-01-16 · ₹2.88 lakh spent
- Construction of Solar Power Fencing from Pannimada to IIT wall in Pudussery South Section under Walayar Range, Palakkad Division FOR001-01-18 · ₹2.72 lakh spent
- Supply, Installation & commissioning of Solar fence from Technical High School Junction to Ambalakkadavu in Kulathuppuzha sectionof Anchal Range, Punalur divison FOR001-01-14 · ₹2.61 lakh spent
- Supply of Materials for Solar Fence Cheekuzhy to Elichira - Nature Fence FOR001-01-02 · ₹2.15 lakh spent
- Supply of Materials for Solar Fence -Chavady-Para Tribal Colony - Nature Fence FOR001-01-03 · ₹2.15 lakh spent
- Construction of Solar Power Fencing from Thonical to Pathipalam in Edamon Section of Thenmala Range during 2017-18 under Thenmala Forest Division (5 kms) FOR001-01-34 · ₹2.11 lakh spent
- Construction of Solar Power Fencing around Randam mile settlement in Kalluvarambu Section of Thenmala Range during 2017-18 under Thenmala Forest Division (3 kms) FOR001-01-30 · ₹2.03 lakh spent
- Construction of Solar Power Fencing around Kulampi settlement in Kalluvarambu Section of Thenmala Range during 2017-18 under Thenmala Forest Division (3 kms) FOR001-01-33 · ₹1.91 lakh spent
- Construction of Solar Power Fencing around Thiruvizhamkunnu Forest Station under Mannarkkad Forest Division FOR001-01-43 · ₹1.27 lakh spent
- Construction of Solar Power fencing around Vattakkarikkom settlement in Kalluvarambu Section of Thenmala Range during 2017-18 under Thenmala Forest Division (2 kms) FOR001-01-32 · ₹1.11 lakh spent
- Fencing - man-animal conflict in forest - Package I FOR001-01-01
- Construction of Elephant proof wall at Wayanad in Sulthan Batheri, Tholpetty, Kurichiat Division FOR001-01-10
- Construction of Crash Guard Steel Rope Fencing from Kunnumpuram to 10th Mile of Sugandhagiri Section in Kalpetta Range, South Wayanad Forest Division, Length - 3 kms FOR001-01-29
- Construction of Solar Power Fencing from Meenvallam to Kurumugham (5 km) in Mannarkkad Range, Mannarkkad Forest Division FOR001-01-48
- Construction of Solar Power Fencing from Pambanthodu - Cherumala to Oodakunnu (4 km) under Mannarkkad Range, Mannarkkad Forest Division FOR001-01-49
- Construction of Solar Power Fencing from Kurumugham to Atla under Mannarkkad Forest Range, Mannarkkad Forest Division (4 km) FOR001-01-50
- Supply, Installation, Testing & Commissioning of Hanging Solar Power Fencing Along the Forest Boundaries of Wayanad Wildlife Forest Division FOR001-01-53
- Supply, Installation, Testing & Commissioning of Hanging Solar Power Fencing Along the Forest Boundaries of Nilambur South Forest Division FOR001-01-54