RWSS to Konni - Aruvappulam - Replacing of damaged 250 mm AC gravity main pipe with 250 mm DI K9 pipe near intake pump house Konni - Aruvappulam.
Estimated amount
Not published
No figure is published for this package alone.
Stage
- Preparation
- Technical sanction
- Tender
- Contract
- Work plan
KIIFB status: WBS Base Zero Approved · How we group
Money trail
- Estimated amount
- ₹57,65,39,815Estimate of sub-project WRD005-123, shared by 20 contract packages
- Expenditure reported · this package
- Not published
- Expenditure reported · all 20 packages
- ₹23,45,50,01640.7% of the estimated amount
Details
- Project code
- WRD005-123-13
- Department
- Water Resources
- Executing agency
- Kerala Water Authority (KWA)
- Constituency
- KonniMLA: Shri. K U Jenish Kumar
- Name as KIIFB publishes it
- KIIFB-RWSS to Konni - Aruvappulam - Replacing of damaged 250 mm AC gravity main pipe with 250 mm DI K9 pipe near intake pump house Konni - Aruvappulam.
What we don't know yet
The KIIFB dashboard does not publish these for this project:
- Contractor, contract amount, scheduled dates, payments and physical progress
- Expenditure so far
Source
- Source
- KIIFB integrated dashboardgis.kiifb.org
- Retrieved
- 30-09-2026
- First recorded
- 30-09-2026
- SHA-256
- 04a00101b9212117…
Other packages under the same sub-project
- UWSS TO PATHANAMTITTA-Replacing damaged AC pipe line at town area ₹7.13 crore spent
- Project 14-RWSS to Angadi - Replacement of damaged pipelines at various places of RWSS to Angadi (5 nos of replacements) ₹3.97 crore spent
- WSS to Adoor and adjoining Panchayaths - Replacing of damaged distribution main in Pallickal Panchayath. ₹3.78 crore spent
- Vallikodu-Kodumon- Replacement of damaged AC pipe from Vallikodu O H tank to Vazhamutom kurisu transmission line and Zionkunnu to Kodumon transmission line ₹2.09 crore spent
- RWSS to Chenneerkara - Mezhuveli - Replacing damaged AC pipe at Pannikuzhy, Elavumthitta, Muttathukonam, Manjanikkara and Ramanchira area ₹1.54 crore spent
- (KIIFB ) RWSS to Konni- Aruvappulam- Replacing old damaged 100mm GI pipe with 200mm DI K9 pipe for Gravity main to Oottupara. ₹1.44 crore spent
- UWSS TO PATHANAMTITTA-Replacing damaged AC pipe line at town area (ref WRD05-123-15)- Restoration work of thePathanamthitta Town road ₹1.24 crore spent
- 9-RWSS to Kaviyoor and Kunnamthanam- Replacing 250 mm AC gravity main with 250mm DI K9-Vyttadu junction to Elavanal sump (2nd Reach) ₹1.15 crore spent