Guruvayoor
16 projects · ₹24.16 crore spent so far
MLA (as KIIFB lists): Shri N. K. Akbar
Sorted by: Flagged first
- Augmentation of CWSS to Nattika Firka Phase I – Package II - Supplying, Laying, Testing and Commissioning 900mm DI K9 Clear Water Pumping Main from Vellani WTP to Chuloor Junction-7670m-800mm, 700mm, 600mm, 500mm & 300mm DI K9 CWPM from Chuloor to Kaipamangalam OH tank, Edathuruthi OH tank and Valappad OH tank. installation of fire hydrant, restoration of roads after laying pipes and allied worksWater Resources · Guruvayoor, Kaipamangalam, Manalur, Nattika₹11.91 crorespent so far
- 14 ROBsPublic Works · Guruvayoor₹5.78 croretotal of works
- Construction of Groins on Southern side of Estuary of Chettuva Fishing HarbourFisheries · Guruvayoor₹4.54 crorespent so far
- Kochanoor Govt HSSGeneral Education · Guruvayoor, Kunnamkulam₹2.7 crorespent so far
- Govt. HSS Manathala, ChavakkadGeneral Education · Guruvayoor₹1.94 crorespent so far
- 2019-20 GURUVAYOOR LAC - Construction of building for Govt. H.S. KadikkadGeneral Education · Guruvayoor₹1.19 crorespent so far
- Govt.HSS ChavakkadGeneral Education · Guruvayoor₹98.23 lakhspent so far
- Gfups, Manthalamkunnu in Thrissur District - Civil WorksFisheries · Guruvayoor₹50.92 lakhspent so far
- GMLPS THIRUVATHRAGeneral Education · Guruvayoor₹35.2 lakhspent so far
- Setting Up of Dialysis Centres - Civil Work - ChavakkadHealth & Family Welfare · Guruvayoor₹3.48 lakhspent so far
- Construction of Groynes on South side of estuary of Chettuva Fishing Harbour-Addittional EstimateFisheries · GuruvayoorNo amount published
- GHSS Manathala - Balance workGeneral Education · GuruvayoorNo amount published
- Augmentation of CWSS to Nattika Firka Phase-I – Package I - 9m dia intake well cum pumphouse, 26MLD Water Treatment Plant , Renovation of existing WTP and existing intake well cum pumphouse, 2 nos RW and 2 nos CW Pumpsets, 500KVA Transformers (3 nos), 700mm DI RWPM - 2700m, restoration of roads and allied worksWater Resources · Guruvayoor, Kaipamangalam, Manalur, NattikaNo amount published
- Augmentation of CWSS to Nattika Firka Phase I – Package II - 900mm DI K9 Clear Water Pumping Main from Vellani WTP to Chuloor Junction 800mm, 700mm, 600mm, 500mm & 300mm DI K9 CWPM, installation of fire hydrant, restoration of roads after laying pipes and allied worksWater Resources · Guruvayoor, Kaipamangalam, Manalur, NattikaNo amount published
- Augmentation of CWSS to Nattika Firka Phase-l-Package III -Dismantling existing pipe line and laying of 700/500/200 mm pipes at Proposed WTP compound, Utility shifting, Leak rectification and Interconnection work.-General Civil WorkWater Resources · Guruvayoor, Kaipamangalam, Manalur, NattikaNo amount published
- Augmentation of CWSS to Nattika Firka Phase-l-Package I - Design,Construction and Commissioning of 9m dia intake well cum pumphouse,26MLDWater Treatment Plant at Vellani, Renovation of existing WTP at Vellani and existing intake well cum pump house at lllickal, Supply erection testing and commissioning of 2 nos RW and 2 nos CW Pumpsets, 500KVA Transformers [2nos),Supplying laying testing and commissioning 700mm DI RWPM - 2700m,restoration of roads after laying pipes and allied works.Water Resources · Guruvayoor, Kaipamangalam, Manalur, NattikaNo amount published