Named on 0 works on the KIIFB dashboard and 10 works on PWD's liability list.
Value of KIIFB contracts
Not published
No contract amount on the KIIFB dashboard.
Recorded as paid by KIIFB
Not published
PWD works under liability now
10
We treat different spellings of a name as one contractor. Two different contractors with the same name may therefore appear as one; the sources give contractors no identifier.
Flags describe the published dates and figures of a work, not the conduct of the contractor. Works are delayed for many reasons, including land acquisition, approvals and payments.
Works on PWD's liability list (10)
- SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 04-10-2023 until 04-10-2026
- Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 09-10-2023 until 09-10-2026
- Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 10-10-2023 until 10-10-2026
- SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 17-10-2023 until 17-10-2026
- SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 24-10-2023 until 24-10-2026
- SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 30-10-2023 until 30-10-2026
- SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 31-10-2023 until 31-10-2026
- Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 22-01-2024 until 22-01-2027
- Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 27-01-2024 until 27-01-2027
- Sabarimala 2021-22 Construction of Retaining wall and Allied works in Elampal-Thadikkadu Road b/w ch 0/000 to 5/500 km. -ch;0/000 to 5/500Roads · Roads Sub Division PunalurBaby VargheseLiable from 25-08-2022 until 25-09-2028