Kanakkuമലയാളം

Baby Varghese

Named on 0 works on the KIIFB dashboard and 10 works on PWD's liability list.

Value of KIIFB contracts

Not published

No contract amount on the KIIFB dashboard.

Recorded as paid by KIIFB

Not published

PWD works under liability now

10

We treat different spellings of a name as one contractor. Two different contractors with the same name may therefore appear as one; the sources give contractors no identifier.

Flags describe the published dates and figures of a work, not the conduct of the contractor. Works are delayed for many reasons, including land acquisition, approvals and payments.

Works on PWD's liability list (10)

  1. SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 04-10-2023 until 04-10-20262 days left
  2. Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 09-10-2023 until 09-10-20267 days left
  3. Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 10-10-2023 until 10-10-20268 days left
  4. SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 17-10-2023 until 17-10-202615 days left
  5. SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 24-10-2023 until 24-10-202622 days left
  6. SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 30-10-2023 until 30-10-202628 days left
  7. SIDE PROTTECTION WORK-CHITHARA PANGODU ROAD CH. 3/300 LHS &RHSRoads · Roads Sub Division KottarakkaraBaby VargheseLiable from 31-10-2023 until 31-10-202629 days left
  8. Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 22-01-2024 until 22-01-2027
  9. Construction of drainage facilities b/w Ch:1/000 and 1/500 in Parippally - Madathara road.-SRRoads · Roads Sub Division KollamBaby VargheseLiable from 27-01-2024 until 27-01-2027
  10. Sabarimala 2021-22 Construction of Retaining wall and Allied works in Elampal-Thadikkadu Road b/w ch 0/000 to 5/500 km. -ch;0/000 to 5/500Roads · Roads Sub Division PunalurBaby VargheseLiable from 25-08-2022 until 25-09-2028