Replacement of Transmission Mains in Thiruvananthapuram PH Circle
Approved by KIIFB
₹77.86 crore
₹77,86,00,000
Paid so far
₹34.41 crore
₹34,40,72,488 · 44.2% of the amount approved
Works
13
₹34.41 crore paid across the works
KIIFB's list gives “payment released” for this project as ₹1,37,62,89,950. That is exactly 4 times what the works below add up to; for projects filed under several districts the list counts the same payments more than once. So we show the total of the works: ₹34,40,72,488.
Works (13)
₹11.86 lakhpaid
₹11.86 lakhapproved
( Work Contract)-Replacement of Existing Damaged 215mm HDPE Pipe of TWSS with 250mm DI pipe from Bhagath Singh Nagar to GLSR at Mannanthala
Work awarded₹1.36 crorepaid
₹1.71 croreapproved
Project 6-KIIFB - CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam Panchayath - Replacing 200 mm AC pipeline along Iyyermukku- Bharathannoor- Kottayappankavu road with 200 mm DI K9 pipe
Work started₹94.1 lakhpaid
₹1.03 croreapproved
PROJECT 6-KIIFB - CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam Panchayath - Replacing 200 mm AC pipeline along Iyyermukku- Bharathannoor- Kottayappankavu road with 200 mm DI K9 pipe - Road Restoration charges
Work awarded₹0paid
₹19.75 lakhapproved
TWSS Rehabilitation of Transmission Main from Peroorkada To Manvia
Work awarded₹23.83 crorepaid
₹52.51 croreapproved
Restoration charges to Corporation for Replacement of Existing Damaged 215mm HDPE Pipe of TWSS with 250mm DI pipe from Bhagath Singh Nagar to GLSR at Mannanthala-
Work awarded₹69 lakhpaid
₹69 lakhapproved
Road Restoration PWD & KRFB Replacing of existing 315mm HDPE pipe of TWSS with 350mm DI Pipe from Observatory to Ayurveda College Junction
Work awarded₹1.67 crorepaid
₹2.09 croreapproved
Replacing of exisitng 315mm HDPE pipes of TWSS with 350mm DI pipe from Observatory to Ayurveda college Jn
Work awarded₹45.2 lakhpaid
₹3.55 croreapproved
Project-4-CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam panchayaths -Replacing 350 mm AC transmission cum distribution main from Chamavila to Nellimukku with 350mm DI K9 pipe
Work awarded₹2.95 crorepaid
₹5.56 croreapproved
Project-5-CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam panchayaths -Replacing 300 mm and 350 mm AC transmission cum distribution main from Nellikunnu to Iyer mukku of Pangode grama panchayath with DI K9 pipes
Work started₹1.84 crorepaid
₹1.91 croreapproved
Rehabilitation of the existing PSC pipe transmission main with MS/DI pipes from Peroorkada to Manvila - Laying of balance quantity of supplied 600mm DI pipe from near Karumbumkonam to Kariyam Junction
Work awarded₹17.6 lakhpaid
₹35.22 lakhapproved
Replacement of existing 315mm HDPE pipe with 350 mm DI K9 from Observatory to Ayurveda College - Relaying and pressure testing from Vanross Junction to Oottukuzhy
Work awarded₹8.21 lakhpaid
₹9.8 lakhapproved
Restoration of PWD road-KIIFB CWSS to Kallara and Pangodu-Replacing 350 mm AC transmission cum distribution main from Chamavila Nellimukku with 350 mm DI K9 pipe and 250 mm AC pipe along KT Kunnu-Pattara road with 250 mm DI K9 pipe (Project 4)-General civil work-Restoration of PWD Road
Work awarded₹29.82 lakhpaid
₹35.18 lakhapproved
Total of the works: ₹70,16,59,496 approved, ₹34,40,72,488 paid.
Details
- Department
- Water Resources
- Implementing agency (SPV)
- Kerala Water Authority (KWA)
- Announced under
- Replacing Transmission mains in 174 schemes 4888 km Promo Transmission mains
- KIIFB status
- Approved
- Name as KIIFB publishes it
- WRD005-121 - Replacement of Transmission Mains in Thiruvananthapuram PH Circle
Source
- Source
- KIIFB project statuskiifb.org/prjStatus.jsp
- Amounts retrieved
- 30-09-2026
- Works last checked
- 01-10-2026
- First recorded
- 30-09-2026
The same project on the map dashboard
KIIFB's two pages share no identifier. We joined these because the approved amount, department and implementing agency are the same.
- TWSS Rehabilitation of Transmission Main from Peroorkada To Manvia WRD005-121-05 · ₹18.81 crore spent
- Project-4-CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam panchayaths -Replacing 350 mm AC transmission cum distribution main from Chamavila to Nellimukku with 350mm DI K9 pipe WRD005-121-09 · ₹1.88 crore spent
- Project-5-CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam panchayaths -Replacing 300 mm and 350 mm AC transmission cum distribution main from Nellikunnu to Iyer mukku of Pangode grama panchayath with DI K9 pipes WRD005-121-10 · ₹1.78 crore spent
- ( Work Contract)-Replacement of Existing Damaged 215mm HDPE Pipe of TWSS with 250mm DI pipe from Bhagath Singh Nagar to GLSR at Mannanthala WRD005-121-02 · ₹1.22 crore spent
- Project 6-KIIFB - CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam Panchayath - Replacing 200 mm AC pipeline along Iyyermukku- Bharathannoor- Kottayappankavu road with 200 mm DI K9 pipe WRD005-121-03 · ₹90.34 lakh spent
- Replacing of exisitng 315mm HDPE pipes of TWSS with 350mm DI pipe from Observatory to Ayurveda college Jn WRD005-121-08 · ₹40.68 lakh spent
- Rehabilitation of the existing PSC pipe transmission main with MS/DI pipes from Peroorkada to Manvila - Laying of balance quantity of supplied 600mm DI pipe from near Karumbumkonam to Kariyam Junction WRD005-121-11 · ₹16.11 lakh spent
- Replacement of existing 315mm HDPE pipe with 350 mm DI K9 from Observatory to Ayurveda College - Relaying and pressure testing from Vanross Junction to Oottukuzhy WRD005-121-12 · ₹7.45 lakh spent
- PROJECT 6-KIIFB - CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam Panchayath - Replacing 200 mm AC pipeline along Iyyermukku- Bharathannoor- Kottayappankavu road with 200 mm DI K9 pipe - Road Restoration charges WRD005-121-04
- Replacement of Existing damaged 315 mm HDPE pipes with 350 mm DI K9 from Observatory to Ayurveda College Junction-Replacement of Existing damaged 315 mm HDPE pipes with 350 mm DI K9 from Observatory to Ayurveda College Junction Balance work Part 1-Pipeline Work WRD005-121-13
- Replacement of Existing damaged 315 mm HDPE pipes with 350 mm DI K9 from Observatory to Ayurveda College JunctionReplacement of Existing damaged 315 mm HDPE pipes with 350 mm DI K9 from Observatory to Ayurveda College Junction Balance work part 2-Pipeline Work WRD005-121-14
- Replacement of Existing damaged 315 mm HDPE pReplacement of Existing damaged 315 mm HDPE pipes with 350 mm DI K9 from Observatory to Ayurveda College Junction Balance work part 3-Pipeline Work WRD005-121-15