Replacement of Existing damaged 315 mm HDPE pReplacement of Existing damaged 315 mm HDPE pipes with 350 mm DI K9 from Observatory to Ayurveda College Junction Balance work part 3-Pipeline Work
Estimated amount
Not published
No figure is published for this package alone.
Stage
- Preparation
- Technical sanction
- Tender
- Contract
- Work plan
KIIFB status: Project Created · How we group
Location
The location KIIFB records lies outside this map.
Money trail
- Estimated amount
- ₹77,86,00,000Estimate of sub-project WRD004-02, shared by 12 contract packages
- Expenditure reported · this package
- Not published
- Expenditure reported · all 12 packages
- ₹25,23,11,26932.4% of the estimated amount
Details
- Project code
- WRD005-121-15
- Department
- Water Resources
- Executing agency
- Kerala Water Authority (KWA)
- Constituency
- ThiruvananthapuramMLA: Shri Antony Raju
- Name as KIIFB publishes it
- KIIFB-Replacement of Existing damaged 315 mm HDPE pReplacement of Existing damaged 315 mm HDPE pipes with 350 mm DI K9 from Observatory to Ayurveda College Junction Balance work part 3-Pipeline Work
What KIIFB approved and paid
On KIIFB's project status page this belongs to “Replacement of Transmission Mains in Thiruvananthapuram PH Circle”. The figures below are for that whole project, not this package alone.
- Approved
- ₹77,86,00,000₹77.86 crore
- Paid so far
- ₹34,40,72,48844.2% of the amount approved
Source: KIIFB project status (kiifb.org). Checked 01-10-2026. How we joined the two sources
What we don't know yet
The KIIFB dashboard does not publish these for this project:
- Contractor, contract amount, scheduled dates, payments and physical progress
- Expenditure so far
Source
- Source
- KIIFB integrated dashboardgis.kiifb.org
- Retrieved
- 30-09-2026
- First recorded
- 30-09-2026
- SHA-256
- 04a00101b9212117…
Other packages under the same sub-project
- TWSS Rehabilitation of Transmission Main from Peroorkada To Manvia ₹18.81 crore spent
- Project-4-CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam panchayaths -Replacing 350 mm AC transmission cum distribution main from Chamavila to Nellimukku with 350mm DI K9 pipe ₹1.88 crore spent
- Project-5-CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam panchayaths -Replacing 300 mm and 350 mm AC transmission cum distribution main from Nellikunnu to Iyer mukku of Pangode grama panchayath with DI K9 pipes ₹1.78 crore spent
- ( Work Contract)-Replacement of Existing Damaged 215mm HDPE Pipe of TWSS with 250mm DI pipe from Bhagath Singh Nagar to GLSR at Mannanthala ₹1.22 crore spent
- Project 6-KIIFB - CWSS to Kallara, Pangode, Panavoor, Pullampara and Vembayam Panchayath - Replacing 200 mm AC pipeline along Iyyermukku- Bharathannoor- Kottayappankavu road with 200 mm DI K9 pipe ₹90.34 lakh spent
- Replacing of exisitng 315mm HDPE pipes of TWSS with 350mm DI pipe from Observatory to Ayurveda college Jn ₹40.68 lakh spent
- Rehabilitation of the existing PSC pipe transmission main with MS/DI pipes from Peroorkada to Manvila - Laying of balance quantity of supplied 600mm DI pipe from near Karumbumkonam to Kariyam Junction ₹16.11 lakh spent
- Replacement of existing 315mm HDPE pipe with 350 mm DI K9 from Observatory to Ayurveda College - Relaying and pressure testing from Vanross Junction to Oottukuzhy ₹7.45 lakh spent