When PWD finishes a road or a building, the contractor stays liable for a set period to repair defects at their own cost. These are the works inside that period, as PWD lists them.

Works under liability now

82

82 works on the list in all

Liability ends within 90 days

21

After that, repairs fall to the public purse.

Contractors

27

Names as PWD publishes them.

If you see a defect: If a work on this list fails inside its period, PWD can make the contractor put it right. Report it to PWD; its own list names the office responsible for each work. PWD's list

The district is that of the PWD office handling the work; some offices also look after works in neighbouring districts.

  1. Gate Anchumoola Road-Providing BM&BC to Gate Anchumoola -Palathara Road km 0/000-2/200 in Thrithala LACRoads · Roads Sub Division ShornurCrezin Infra LlpLiable from 03-10-2023 until 03-10-20261 day left
  2. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 04-10-2023 until 04-10-20262 days left
  3. LAC-ADS-2018-19-CONSTRUCTION OF CLASS ROOM BUILDING &AUDITORIUM AT GLP SCHOOL KALLADIPATTABuildings · Buildings Sub Division ShornurKrishnakumarLiable from 04-10-2021 until 04-10-20262 days left
  4. MPLADS 2018-19, Construction of building to Community Welfare Centre, Thottakam VaikomBuildings · Buildings Sub Division ShornurKrishnakumarLiable from 04-10-2021 until 04-10-20262 days left
  5. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 05-10-2023 until 05-10-20263 days left
  6. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 08-10-2023 until 08-10-20266 days left
  7. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 09-10-2023 until 09-10-20267 days left
  8. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 10-10-2023 until 10-10-20268 days left
  9. Construction of Veterinary Hospital at Sreekrishnapuram.Buildings · Buildings Sub Division ShornurT T MathewLiable from 13-10-2021 until 13-10-202611 days left
  10. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 13-10-2023 until 13-10-202611 days left
  11. General Education Department - Annual Plan 2019-20 Construction of school building of Government U.P School Korattikkara ,ThrissurBuildings · Buildings Sub Division ShornurT T MathewLiable from 13-10-2021 until 13-10-202611 days left
  12. Gate Anchumoola Road-Providing BM&BC to Gate Anchumoola -Palathara Road km 0/000-2/200 in Thrithala LACRoads · Roads Sub Division ShornurCrezin Infra LlpLiable from 20-10-2023 until 20-10-202618 days left
  13. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 13-11-2023 until 13-11-202642 days left
  14. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 15-11-2023 until 15-11-202644 days left
  15. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 18-11-2023 until 18-11-202647 days left
  16. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 21-11-2023 until 21-11-202650 days left
  17. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 23-11-2023 until 23-11-202652 days left
  18. LAC ADF 2018-19. CONSTRUCTION OF NEW O.P. AND DIALYSIS BUILDING AT TALUK HOSPITAL IN PATTAMBIBuildings · Buildings Sub Division ShornurRasheed PLiable from 01-12-2021 until 01-12-202660 days left
  19. FDR-Improvements to Pakkulam Kandiyur Jellippara road (1/600 to 4/000)Roads · Roads Sub Division MannarkadVeerankutty A KLiable from 20-12-2023 until 20-12-202679 days left
  20. LAC-ADF 2018-19-Construction of building for BUDS school at Vallapuzha Grama PanchayathBuildings · Buildings Sub Division ShornurM V KunhimohammedLiable from 24-12-2021 until 24-12-202683 days left
  21. Regional Poultry Farm Manarcadu- Construction of Poultry sheds (2 nos)Buildings · Buildings Sub Division ShornurM V KunhimohammedLiable from 24-12-2021 until 24-12-202683 days left
  22. Gate Anchumoola Road-Providing BM&BC to Gate Anchumoola -Palathara Road km 0/000-2/200 in Thrithala LACRoads · Roads Sub Division ShornurCrezin Infra LlpLiable from 24-01-2024 until 24-01-2027
  23. Gate Anchumoola Road-Providing BM&BC to Gate Anchumoola -Palathara Road km 0/000-2/200 in Thrithala LACRoads · Roads Sub Division ShornurCrezin Infra LlpLiable from 25-01-2024 until 25-01-2027
  24. Gate Anchumoola Road-Providing BM&BC to Gate Anchumoola -Palathara Road km 0/000-2/200 in Thrithala LACRoads · Roads Sub Division ShornurCrezin Infra LlpLiable from 26-01-2024 until 26-01-2027
  25. Gate Anchumoola Road-Providing BM&BC to Gate Anchumoola -Palathara Road km 0/000-2/200 in Thrithala LACRoads · Roads Sub Division ShornurCrezin Infra LlpLiable from 27-01-2024 until 27-01-2027
  26. Gate Anchumoola Road-Providing BM&BC to Gate Anchumoola -Palathara Road km 0/000-2/200 in Thrithala LACRoads · Roads Sub Division ShornurCrezin Infra LlpLiable from 29-01-2024 until 29-01-2027
  27. Collegiate Education Department-plan fund 2020-21 -K.K.T.M Govt. Collge Pullut, Kodungallur - Construction of compound wallBuildings · Buildings Sub Division PalakkadAnoop MoopanLiable from 05-02-2022 until 05-02-2027
  28. Construction of Election warehouse for storage of EVM and VVPAT machines at Yakkara in Palakkad District. -Work-General Civil Work-1Buildings · Buildings Sub Division PalakkadAnoop MoopanLiable from 05-02-2022 until 05-02-2027
  29. GENERAL EDUCATION DEPARTMENT - ANNUAL PLAN-2019-20- CONSTRUCTION OF BUILDING FOR GOVT.L.P SCHOOL ,EDAPPATTA IN MALAPPURAM DISTRICT.Buildings · Buildings Sub Division ShornurSakeer Hussain M.VLiable from 11-02-2022 until 11-02-2027
  30. LAC-ADS 2019-20 CONSTRUCTION OF PROPOSED CLASS ROOM BUILDING & AUDITORIUM AT GOVT.LPS VALLOORBuildings · Buildings Sub Division ShornurSakeer Hussain M.VLiable from 11-02-2022 until 11-02-2027
  31. Budget Work 2020-21 - Construction of Kodumbu Foot Bridge across Sokanashini River in Kodumbu Gramapanchayath in Malampuzha LAC in Palakkad District.Bridges · Bridges Sub Division PalakkadJoby J OokkenLiable from 19-02-2022 until 19-02-2027
  32. CONSTRUCTION OF UPPER PRIMARY BLOCK FOR GOVT. SANSKRIT HIGHER SECONDARY SCHOOL, MEPPAYIL,VATAKARABuildings · Buildings Sub Division PalakkadAnoop MoopanLiable from 29-01-2021 until 28-02-2027
  33. Maintenance work to work shop, L block at Govt. polytechnic college, palakkadBuildings · Buildings Sub Division PalakkadAnoop MoopanLiable from 29-01-2021 until 28-02-2027
  34. Budget Work 2019-20 - Re Construction of Mangalam Bridge at 0/200 of Vadakkenchery Bazar Road in Tarur LAC in Palakkad DistrictBridges · Bridges Sub Division PalakkadGeogy George KLiable from 28-05-2022 until 28-05-2027
  35. General Education Department -Annual Plan 2019-20 -Construction of School Building of Government L.P School,Karad, Malappuram District.Buildings · Buildings Sub Division ShornurMuhammed Raneesh.eLiable from 06-07-2022 until 06-07-2027
  36. PROVIDING A NEW ENTRANCE TOWARDS THE CHERPULASSERY ROAD AT SNGS COLLEGE PATTAMBIBuildings · Buildings Sub Division ShornurMuhammed Raneesh.eLiable from 06-07-2022 until 06-07-2027
  37. Budget Work 2015 - 16 Improvements to Palappuram Kuthiravazhi road and construction of bridge across Mulanjoor thodu in Ottappalam LAC in Palakkad DistrictBridges · Bridges Sub Division PalakkadAmmu InfrastucturesLiable from 25-10-2022 until 25-10-2027
  38. Construction of School building of Government L.P.School, Pulinelly, Palakkad.Buildings · Buildings Sub Division ChitturHarinarayanan KLiable from 25-11-2022 until 25-11-2027
  39. General Education Department-Higher Secondary Education-Annual plan 2018-19-Construction of new blocks for Government Higher Secondary School Palapetty in Malappuram District (Ponnani L.A.C.)Buildings · Buildings Sub Division ChitturHarinarayanan KLiable from 25-11-2022 until 25-11-2027
  40. Construction of Compound wall to Govt. College, Chittur-Work-General Civil Work-1Buildings · Buildings Sub Division ChitturB.mohammed HajeeLiable from 17-12-2022 until 17-12-2027
  41. Construction of Class Rooms at L.P. School ,Mundur,PalakkadBuildings · Buildings Sub Division PalakkadK ShajiLiable from 03-01-2023 until 03-01-2028
  42. Construction of retaining wall near Kanakakkunnu compound (Balance Work)Buildings · Buildings Sub Division PalakkadK ShajiLiable from 03-01-2023 until 03-01-2028
  43. LAC - ADS- Chittur - 2018-19 - Construction of Building for Bhagavathi Govt. High School, Vannamada (First phase)Buildings · Buildings Sub Division ChitturAhammed KabeerLiable from 25-01-2023 until 25-01-2028
  44. GLPS PARUTHUR-CONSTRUCTION OF SCHOOL BUILDINGBuildings · Buildings Sub Division ShornurEccr Construction And Developers Private LimitedLiable from 17-02-2023 until 17-02-2028
  45. Renovation works-Providing Additional facilities and maintenance works of I.B Aryankavu-workBuildings · Buildings Sub Division ShornurEccr Construction And Developers Private LimitedLiable from 17-02-2023 until 17-02-2028
  46. Providing Additional Facilities to District Treasury, Palakkad-Work-General Civil Work-1Buildings · Buildings Sub Division PalakkadRajan VargheseLiable from 01-03-2023 until 01-03-2028
  47. Budget 2018-19 - Re construction of Maniyanpara Bridge at Tarur Ring Road (Pilapully- Maniyanpara Road ) in Tarur LAC ,Palakkad Dist.Bridges · Bridges Sub Division PalakkadK K ConsructionsLiable from 03-03-2023 until 03-03-2028
  48. Construction of Higher Secondary Block Building for Govt SMHSS Thathamangalam.Buildings · Buildings Sub Division ChitturMohammed RafeeqLiable from 03-03-2023 until 03-03-2028
  49. Construction of first floor to the existing theory block for IT LAB at Govt. Womens ITI KalamasseryBuildings · Buildings Sub Division ChitturMohammed RafeeqLiable from 03-03-2023 until 03-03-2028
  50. Construction of school building of Government L.P School Panniyankara,Palakkad.Buildings · Buildings Sub Division ChitturMohammed SunaifLiable from 03-04-2023 until 03-04-2028
  51. Repair and maintenance works for mens hostel building Tiling of 1 st floor rooms and Varandah, Government Polytechnic College MTI ThrissurBuildings · Buildings Sub Division ChitturMohammed SunaifLiable from 03-04-2023 until 03-04-2028
  52. Barrier Free Palakkad- Proposal for Ramp , Disabled Friendly Toilets and Signages for Govt Buildings under P W D Buildings Section No:1,Palakkad.Buildings · Buildings Sub Division PalakkadK P Suresh KumarLiable from 05-04-2023 until 05-04-2028
  53. Govt. Women’s College, Thiruvananthapuram- Asset Maintenance Of Botany, Zoology, Chemistry, Psychology, Statistics, Music, Home Science Department Buildings, Main Building, Assembly Hall And Connected Works.Buildings · Buildings Sub Division MannarkadK ShajiLiable from 29-04-2023 until 29-04-2028
  54. SCREENING BLOCK G.T.S.HOSPITAL KOTTATHARA,AGALI,PALAKKAD DISTRICTBuildings · Buildings Sub Division MannarkadK ShajiLiable from 29-04-2023 until 29-04-2028
  55. Budget work - ( with 20 % in 2019-20) :- Construction of Mayappara bridge and allied approach Roads in Malampuzha LAC in Palakkad District.Bridges · Bridges Sub Division PalakkadV Abdul MajeedLiable from 30-06-2023 until 30-06-2028
  56. Construction of ESS, ACP and Animal House for Govt. Medical College Palakkad.Buildings · Buildings Sub Division Medical College PalakkadM V KunhimohammedLiable from 03-07-2023 until 03-07-2028
  57. Construction of an Electrical Block, Centre for Energy Management Services and Open Theatre at Govt.Poly Technic College, Palakkad District.-Construction of an Electrical Block, Centre for Energy Management Services and Open Theatre at Govt.Poly Technic College, Palakkad District.-General Civil Work-1Buildings · Buildings Sub Division PalakkadBabu IsaacLiable from 03-07-2023 until 03-07-2028
  58. CONSTRUCTION OF GALLERY FOR CHALISSERY HSS PLAY GROUND -Work-Composite WorkBuildings · Buildings Sub Division ShornurSakeer Hussain M.VLiable from 30-07-2023 until 30-07-2028
  59. INDUSTRIES DEPT- INDUSTRIAL DEVELOPMENT AREA, KAPPUR -CONSTRUCTION OF AN OFFICE BUILDING FOR ESTATE OFFICER-Composite WorkBuildings · Buildings Sub Division ShornurEccr Construction And Developers Private LimitedLiable from 16-08-2023 until 16-08-2028
  60. LAC-ADS-PATTAMBI TALUK HOSPITAL-DIALYSIS BLOCK- ADDITIONAL WORKS-Composite WorkBuildings · Buildings Sub Division ShornurRasheed PLiable from 16-08-2023 until 16-08-2028

Contractors with the most works

Counted by works now under liability. We treat different spellings of a name as one; two people with the same name may have been counted together.

All contractors

Source

Source: the Kerala Public Works Department's DLP work list, which we read once a week. We do not keep or show the phone numbers printed on PWD's pages. The agreed amount sits in the code of PWD's page without being displayed there, so it may be provisional or out of date; PWD has filled it in for only 0 of the 82 works now under liability.