Kerala · Malappuram district
Where the public money goes
What was sanctioned, who got the contract, what has been paid and how far the work has come. Every number carries its source.
projects13 departments, 16 constituencies
₹1,251.36 crorespent so faras KIIFB reports it
10projects with a flaga flag is not an accusation
2 Octlast checkedagainst the KIIFB dashboard, daily
Approved and paid
From KIIFB's own project status page: what it approved for the projects listed under Malappuram, and what has been paid. Some span several districts.
Approved by KIIFB
₹4,860.4 crore
₹48,60,40,28,366
Paid so far
₹2,332.56 crore
48% of the amount approved
Who must repair it
For 225 finished PWD works, the contractor is still liable to repair defects. Which road or building, which contractor, and until when.
Flagged right now
Projects whose published figures crossed a threshold. A flag is not evidence of wrongdoing.
- 14 ROBsPublic Works · Tirurangadi₹296.52 croretotal of works
- 14 ROBsPublic Works · Tirurangadi₹296.52 croretotal of works
- Construction of Regulator cum BridgeWater Resources · Kottakkal₹125.61 croretotal of works
- Construction of Regulator cum BridgeWater Resources · Mankada₹67.64 croretotal of works
- 68 BridgesPublic Works · Tirur,Thavanur₹61.34 croretotal of works
- Hill Highway - Widening and Providing BM & BC to Pookkottumpadam - Thampurattikkallu Munderi seed farm gate road (Reach 1 - ch 0/000 to 15/000) - Nilambur LAC in Malappuram District - ContractPublic Works · Nilambur₹57.86 crorespent so far
By department
All projectsBy constituency
MLA names are as the KIIFB dashboard lists them.
Where projects stand
KIIFB's status labels, grouped by us into plain stages.
Most spent so far
Full list- Parappanangadi Fishing Harbour - Civil worksFisheries · Tirurangadi₹112.22 croreestimate
- Improvements and Providing DBM & BC Works on Kondotty-Edavannappara - Areacode road between km 0/000 and 20/968 ( excluding km 11/600 to 11/950) in Malappuram District - Phase 1 - ContractPublic Works · Kondotty₹103.07 croreestimate
- Hill Highway - Widening and Providing BM & BC to Pookkottumpadam - Thampurattikkallu Munderi seed farm gate road (Reach 1 - ch 0/000 to 15/000) - Nilambur LAC in Malappuram District - ContractPublic Works · Nilambur₹57.86 crorespent so far
- Thrissivaperur Line Strengthening Package IIPower · Ponnani₹203.91 croreestimate
- Hill Highway - Widening and Providing BM & BC to Pookottumpadam - Moolepadam bridge Road in Nilambur & Eranad LACs, Malappuram district 20.5 Km - Phase 1 - (Reach 1- Km 0/00 to Km 10/900, Pookottumpadam to Myladi bridge)Public Works · Ernad, Ernad,Nilambur, Nilambur₹42.04 crorespent so far
How to read this
You can see the source
Every figure comes from a government body's own page. We keep a dated copy of that page, and you can download it.
One rule for everyone
Flags come from published thresholds, applied the same way to every project, party and constituency.
We say what is missing
Each project page lists what the source does not publish, such as the contractor or the payments.