Kanakkuമലയാളം

Kerala · Malappuram district

Where the public money goes

What was sanctioned, who got the contract, what has been paid and how far the work has come. Every number carries its source.

Each dot is a project location as KIIFB records it. 9 are recorded outside this map.Open the map

Approved and paid

From KIIFB's own project status page: what it approved for the projects listed under Malappuram, and what has been paid. Some span several districts.

Project by project

Approved by KIIFB

₹4,860.4 crore

₹48,60,40,28,366

Paid so far

₹2,332.56 crore

48% of the amount approved

Projects and works

146

592 works · 26 projects still under evaluation

See them all

Who must repair it

For 225 finished PWD works, the contractor is still liable to repair defects. Which road or building, which contractor, and until when.

See the list

Flagged right now

Projects whose published figures crossed a threshold. A flag is not evidence of wrongdoing.

What the flags mean
  1. 14 ROBsPublic Works · Tirurangadi₹296.52 croretotal of worksOverdue
  2. 14 ROBsPublic Works · Tirurangadi₹296.52 croretotal of worksOverdue
  3. Construction of Regulator cum BridgeWater Resources · Kottakkal₹125.61 croretotal of worksOverdue
  4. Construction of Regulator cum BridgeWater Resources · Mankada₹67.64 croretotal of worksOverdue
  5. 68 BridgesPublic Works · Tirur,Thavanur₹61.34 croretotal of worksOverdue
  6. Hill Highway - Widening and Providing BM & BC to Pookkottumpadam - Thampurattikkallu Munderi seed farm gate road (Reach 1 - ch 0/000 to 15/000) - Nilambur LAC in Malappuram District - ContractPublic Works · Nilambur₹57.86 crorespent so farOverdueWork plan

All flagged projects

By department

All projects

By constituency

MLA names are as the KIIFB dashboard lists them.

Where projects stand

KIIFB's status labels, grouped by us into plain stages.

Most spent so far

Full list
  1. Parappanangadi Fishing Harbour - Civil worksFisheries · Tirurangadi₹112.22 croreestimateWork plan
  2. Improvements and Providing DBM & BC Works on Kondotty-Edavannappara - Areacode road between km 0/000 and 20/968 ( excluding km 11/600 to 11/950) in Malappuram District - Phase 1 - ContractPublic Works · Kondotty₹103.07 croreestimateWork plan
  3. Hill Highway - Widening and Providing BM & BC to Pookkottumpadam - Thampurattikkallu Munderi seed farm gate road (Reach 1 - ch 0/000 to 15/000) - Nilambur LAC in Malappuram District - ContractPublic Works · Nilambur₹57.86 crorespent so farOverdueWork plan
  4. Thrissivaperur Line Strengthening Package IIPower · Ponnani₹203.91 croreestimateWork plan
  5. Hill Highway - Widening and Providing BM & BC to Pookottumpadam - Moolepadam bridge Road in Nilambur & Eranad LACs, Malappuram district 20.5 Km - Phase 1 - (Reach 1- Km 0/00 to Km 10/900, Pookottumpadam to Myladi bridge)Public Works · Ernad, Ernad,Nilambur, Nilambur₹42.04 crorespent so farWork plan

How to read this

You can see the source

Every figure comes from a government body's own page. We keep a dated copy of that page, and you can download it.

One rule for everyone

Flags come from published thresholds, applied the same way to every project, party and constituency.

We say what is missing

Each project page lists what the source does not publish, such as the contractor or the payments.