Approved and paid

From KIIFB's own project status page: what it approved for the projects listed under Ernakulam, and what has been paid. Some span several districts.

Project by project

Approved by KIIFB

₹12,945.99 crore

₹1,29,45,99,14,337

Paid so far

₹5,577.41 crore

43.1% of the amount approved

Projects and works

139

525 works · 28 projects still under evaluation

See them all

Who must repair it

For 202 finished PWD works, the contractor is still liable to repair defects. Which road or building, which contractor, and until when.

See the list

Flagged right now

Projects whose published figures crossed a threshold. A flag is not evidence of wrongdoing.

What the flags mean
  1. Construction of 6 By passesPublic Works · Perumbavoor₹301.72 croretotal of worksOverdue
  2. Development of Muvattupuzha Town Portion CH 0/000 to CH 1/850 Post Office Junction to Petta Road - Work ContractPublic Works · Muvattupuzha₹45.6 croreestimateOverdueWork plan
  3. Construction of Tank Bund Road Bridge in Chilavannur CanalCoastal Shipping & Inland Navigation · Ernakulam₹39.07 croreestimateOverdueContract
  4. Construction of Regulator cum BridgeWater Resources · Thripunithura₹25.76 croretotal of worksOverdue

All flagged projects

By department

All projects

By constituency

MLA names are as the KIIFB dashboard lists them.

Where projects stand

KIIFB's status labels, grouped by us into plain stages.

Most spent so far

Full list
  1. - Reformation of Damaged Sunken Sea wall Using Tetrapods in between CP stone 976 and 1052 for 10 km stretches along Chellanam Coast- Phase I for a length of 7.350 Km between CP 986 and CP 1026.Water Resources · Kochi₹362.65 croreestimateWork plan
  2. Kochi Lines Package OH portionPower · Aluva, Devikulam, Kothamangalam, Kunnathunad, Perumbavoor, Thrikkakara₹372.73 croreestimateContract
  3. CCRC - Balance Civil & MEP worksHealth & Family Welfare · Aluva, Kalamassery₹169.21 crorespent so farContract
  4. GIS Package - I (Aluva GIS, Kaloor GIS, Kunnamangalam GIS & Brahmapuram bay)Power · Aluva, Ernakulam, Kunnamangalam₹157.25 crorespent so farContract
  5. GMCE - Civil Works for Super specialty BlockHealth & Family Welfare · Aluva, Kalamassery₹139.88 crorespent so farContract

How to read this

You can see the source

Every figure comes from a government body's own page. We keep a dated copy of that page, and you can download it.

One rule for everyone

Flags come from published thresholds, applied the same way to every project, party and constituency.

We say what is missing

Each project page lists what the source does not publish, such as the contractor or the payments.