Kerala · Kollam district
Where the public money goes
What was sanctioned, who got the contract, what has been paid and how far the work has come. Every number carries its source.
projects16 departments, 11 constituencies
₹828.65 crorespent so faras KIIFB reports it
10projects with a flaga flag is not an accusation
2 Octlast checkedagainst the KIIFB dashboard, daily
Approved and paid
From KIIFB's own project status page: what it approved for the projects listed under Kollam, and what has been paid. Some span several districts.
Approved by KIIFB
₹4,682.61 crore
₹46,82,60,97,533
Paid so far
₹2,639.59 crore
56.4% of the amount approved
Provisional: the work tables of 49 projects are still to be read.
Who must repair it
For 245 finished PWD works, the contractor is still liable to repair defects. Which road or building, which contractor, and until when.
Flagged right now
Projects whose published figures crossed a threshold. A flag is not evidence of wrongdoing.
- 182 RoadsPublic Works · Pathanapuram₹66.42 croretotal of works
- 68 BridgesPublic Works · Kunnathur₹52.37 croretotal of works
- 182 RoadsPublic Works · Pathanapuram₹46.38 croretotal of works
- 137 RoadsPublic Works · Eravipuram₹29.45 croretotal of works
- 68 BridgesPublic Works · Chavara₹25.7 croretotal of works
- 69 BridgesPublic Works · Chathannoor₹14.47 croretotal of works
By department
All projectsBy constituency
MLA names are as the KIIFB dashboard lists them.
Where projects stand
KIIFB's status labels, grouped by us into plain stages.
Most spent so far
Full list- Augmentation of Water Supply Scheme to Kollam Corporation Phase II-Package I -Laying Raw Water Pumping Main with 1219 Mm ,12.5 Mm Thick M.s Pipe for a Length of 16035 M and 10 Mm Thick M.s Pipe for a Length of 12095 M from Intake Well at Njankadavu to WTP at VasoorichiraWater Resources · Kollam₹118.37 crorespent so far
- All works of Sree Narayana Guru Cultural Complex at KollamCultural Affairs · Eravipuram, Kollam₹50.39 crorespent so far
- Development of Taluk Hospital, Pathanapuram- Civil & MEP worksHealth & Family Welfare · Pathanapuram₹91.88 croreestimate
- Construction of Taluk Hospital Karunagappally with MEP & without MGPS, PTS & DGHealth & Family Welfare · Karunagapally₹47.56 crorespent so far
- Punalur Taluk Hospital- Construction of New Block and Augmenting Basic Infrastructure - Package 1Health & Family Welfare · Punalur₹36.01 crorespent so far
How to read this
You can see the source
Every figure comes from a government body's own page. We keep a dated copy of that page, and you can download it.
One rule for everyone
Flags come from published thresholds, applied the same way to every project, party and constituency.
We say what is missing
Each project page lists what the source does not publish, such as the contractor or the payments.