projects15 departments, 13 constituencies
₹920.21 crorespent so faras KIIFB reports it
11projects with a flaga flag is not an accusation
2 Octlast checkedagainst the KIIFB dashboard, daily
Approved and paid
From KIIFB's own project status page: what it approved for the projects listed under Thrissur, and what has been paid. Some span several districts.
Approved by KIIFB
₹5,403.41 crore
₹54,03,41,13,609
Paid so far
₹3,682.32 crore
68.1% of the amount approved
Provisional: the work tables of 100 projects are still to be read.
Who must repair it
For 295 finished PWD works, the contractor is still liable to repair defects. Which road or building, which contractor, and until when.
Flagged right now
Projects whose published figures crossed a threshold. A flag is not evidence of wrongdoing.
- Construction of 11 BridgesPublic Works · Ollur₹10.24 croretotal of works
- Construction of Azhikode-Munambam Bridge in Thrissur District - ContractPublic Works · Kaipamangalam₹200.15 croreestimate
- 182 RoadsPublic Works · Kunnamkulam₹89.84 croretotal of works
- 2016-17 Peechi - Vazhani Tourism Corridor, Improvements with BM & BC to road from Mudikkode to Karumathra Via Chirakkekode, Ponganengad, Thanikkudam, Kundukkad ( Phase I) km 7/000 to 18/650 in Thrissur DistrictPublic Works · Ollur₹55.19 crorespent so far
- Improvements to Nadathara - Moorkkanikkara - Kannara Road ch 0/000 to 11/636 with DBM and BC in Ollur LA constituency in Thrissur District- FDR -ContractPublic Works · Ollur₹50.12 croreestimate
- 68 BridgesPublic Works · Chelakkara₹33.14 croretotal of works
By department
All projectsBy constituency
MLA names are as the KIIFB dashboard lists them.
Where projects stand
KIIFB's status labels, grouped by us into plain stages.
Most spent so far
Full list- Development of GMC Thrissur - Construction of Mother & Child Block- Civil & MEP worksHealth & Family Welfare · Wadakkanchery₹279.19 croreestimate
- Development of GMC Thrissur- Construction of Super Specialty Block-Civil & MEP worksHealth & Family Welfare · Wadakkanchery₹199.41 croreestimate
- Construction of Azhikode-Munambam Bridge in Thrissur District - ContractPublic Works · Kaipamangalam₹200.15 croreestimate
- 2016-17 Peechi - Vazhani Tourism Corridor, Improvements with BM & BC to road from Mudikkode to Karumathra Via Chirakkekode, Ponganengad, Thanikkudam, Kundukkad ( Phase I) km 7/000 to 18/650 in Thrissur DistrictPublic Works · Ollur₹55.19 crorespent so far
- GIS Package 3 - Construction of 220kV GIS Substation KunnamakulamPower · Kunnamkulam₹43.01 crorespent so far
How to read this
You can see the source
Every figure comes from a government body's own page. We keep a dated copy of that page, and you can download it.
One rule for everyone
Flags come from published thresholds, applied the same way to every project, party and constituency.
We say what is missing