What was sanctioned, who got the contract, what has been paid and how far the work has come. Every number carries its source.

Each dot is a project location as KIIFB records it. 14 are recorded outside this map.Open the map

Approved and paid

From KIIFB's own project status page: what it approved for the projects listed under Kozhikode, and what has been paid. Some span several districts.

Project by project

Approved by KIIFB

₹5,515.41 crore

₹55,15,41,40,244

Paid so far

₹3,245.38 crore

58.8% of the amount approved

Provisional: the work tables of 150 projects are still to be read.

Projects and works

164

91 works · 28 projects still under evaluation

See them all

Who must repair it

For 197 finished PWD works, the contractor is still liable to repair defects. Which road or building, which contractor, and until when.

See the list

Flagged right now

Projects whose published figures crossed a threshold. A flag is not evidence of wrongdoing.

What the flags mean
  1. Hill HighwayPublic Works · Nadapuram₹110.67 croretotal of worksPayment ahead of progress
  2. 182 RoadsPublic Works · Thiruvambady₹108.16 croretotal of worksOverdue
  3. Hill High wayPublic Works · Perambra₹82.49 croretotal of worksOverdue
  4. Construction of Regulator cum BridgeWater Resources · Perambra₹72.63 croretotal of worksOverdue
  5. 182 RoadsPublic Works · Kunnamangalam,Koduvally₹61 croretotal of worksOverdue
  6. Construction of Valiyapalam Bridge at Puthiyapalam across Canoli Canal in Kozhikkode District - Contract WorksPublic Works · Kozhikode South₹59.01 croreestimateOverdueWork plan

All flagged projects

By department

All projects

By constituency

MLA names are as the KIIFB dashboard lists them.

Where projects stand

KIIFB's status labels, grouped by us into plain stages.

Most spent so far

Full list
  1. Hill Highway between Kodanchery and Kakkadampoyil Km.83.900 to 119.250 in Kozhikode District- ContractPublic Works · Thiruvambady₹171.35 crorespent so farContract
  2. GIS Package - I (Aluva GIS, Kaloor GIS, Kunnamangalam GIS & Brahmapuram bay)Power · Aluva, Ernakulam, Kunnamangalam₹157.25 crorespent so farContract
  3. Hill Highway first reach Pullavai to Thottilpalam 0/000 to 28/000 in Kozhikkode District (Phase 1 11/900 to 19/700 and 21/700 to 28/000 Total length - 14.10 Km) Part TS- Contract WorkPublic Works · Nadapuram₹47.99 crorespent so farOverdueWork plan
  4. Mannur - Chaliyam Road- Contract workPublic Works · Beypore₹51.37 croreestimateWork plan
  5. Hill Highway-Improvements to Thalayad-Malappuram-Kodenchery (18km) road in Kozhikode District - Phase 1 - Thalayad (Padikkal Vayal) to 21/6 Mile (9.99km) - Contract FilePublic Works · Balusseri, Balusseri,Koduvally,Thiruvambady, Koduvally, Thiruvambady₹42.01 crorespent so farOverdueWork plan

How to read this

You can see the source

Every figure comes from a government body's own page. We keep a dated copy of that page, and you can download it.

One rule for everyone

Flags come from published thresholds, applied the same way to every project, party and constituency.

We say what is missing

Each project page lists what the source does not publish, such as the contractor or the payments.